G E ?! E R A L h E LE CT E ! C
" * "^" "'
AND SERVICES GENERAL ELECTRIC COMPANY,17s CURTNER AVE.. SAN JOSE, C LUFCPNIA 95125 D1 VISION o
l SPENT FUEL SERVICES OPERAT10i b-d2
/P DMD-369 9
DOCKETED USNRC
- C,
SNM-1270 Docket No. 7041220 E
NOV 2 0 G79 > f 4
Ngs$
>f a
a' man.sECTICN
/.?
November 7, 1979 oOcKET CW (
J 3
9
_.. Q,' '
s*-
Office of Nuclear Material SafetT& Safeguards
- i
~6
~
Attn:
R.E. Cunningham, Director G"
a*
Division of Fuel Cycle & Materici Safety U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
APPLICATION FOR AMENDMENT OF MATERIALS LICENSE SNM-1270 Gentlemen:
Recent changes in 10CFR73 regarding the shipmant of irradiated nuclear fuel have nullified the authorization for possession of such material under the conditions of License No. SNM-1270. This situation will seriously impede many research and developmeat projects being conducted by General Electric. These include projects involving improvements in the safety of reactor operation that require and depend upon timely shipments of irradiated nuclear fuel between commercial nuclear po er plants and laboratories.
For example, shipments of segmented rods between Monticello, Minnesota and the GE Vallecitos Nuclear Center are required in the continuing pellet-clad inter.iction remedy program sponsored by 00E and Commonwealth Research Corporation. Likewise, under an EPRI program, production fuel rods are shipped between Brunswick Huclear Power Station (CF&L) and Battelle Memorial Institute Laboratories. Some projects also involve non-fuel components, such as activated materials and chemistry samples not subject to 10CFR73.
General Electric believes that these and similar projects contribute significantly to the safe and economical operation of nuclear power plants and should continue.
In order to continue these projects and to carry out contractural commitments, General Electric Lu pany must be capable of assuming complete responsi.,11ity for these shipments as shipper I.;rc:.a:n:..............x..;....'
cM:.';ti:/R?%....
f.c:a.:: c::: :rf.lU..... 8002270036 '
Ty; c.: Fa c.......[f
.'.f....
E ta Cr.:d Ec 'd..#
Rec:P.;J 2*.j.Cyvg......
/
14636
G E N E R A L [j) E LE CT R I C of the radioactive material from NRC licensed facilities.
Therefore, an amendment of Materials License No. SMM-1270 is requested in accordance with the following paragraphs:
o Revise License item 6 as follows:
"6. Byproduct, source and/or special nuclear material.
Special nuclear material, which may be irradiated, shall be contained in fuel pellets, rods and rod segments, or fuel bundles used in research and development activities (as defined in 10CFR70.4). All other materials subject to requirements of 10CFR73 are excluded."
o Revise License item 9 as folicws:
"9. Authorized Use: Receipt and possession of materials specified in items 6. through 8., above, in packages approved pursuant to 10CFR71 or fabricated in accordance with applicable D0T specifications, for the purpose of delivery to a carrier for transport and private carriage in accordance with other conditions of this license."
o Add the following conditions:
"11. The licensee shall utilize its personnel, who shall have been trained in the practices and procedures appro-priate to the nuclear materials and shipping package involved in each instance, to inspect and monitor the loading of each package to verify:
a.
that nuclear material to be shipped is in accordance with conditions of this license and in compliance with requirements of the license, Certificate of Compliance, or DOT specification for the package to be employed; b.
that the package is loaded, sealed, tested, and/or otherwise prepared for shipment in accordance with requirements of the license, Certificate of Compliance, or DOT specification for the package to be employed."
"12.
The licensee shall receive the loaded shipping package at the loading dock, or equivalent location, at the NRC licensed facility from which the shipment will originate. The licensee shall then deliver the loaded package to the carrier for trans-port which shall be subject to applicable regulations."
These license modifications will permit continuation of projects im-portant to the continued safe operation of nuclear plants while incorporating 4
u G E N E R A L ([I E LE CT RIC measures to verify that the material and packaging involved in each shipment meet applicable standards and regulations. General Electric will assume responsibility for the package and its contents at a location clear of all plant safety systems and related devices, prior to release of the package to the carrier.
General Electric believes that these modifications of License No. SNM-1270 satisfy the concerns of the Commission, as presently understood.
Please consider this amendment of License No. SNM-1270 as soon as possible to prevent untoward delays '. reactor safety programs and other 1
projects. Messrs. C.C. Herrington or H.A. Rogers of this office may be contacted if there are quest,ans regarding this application. A check in the amount of $150.00 is enclosed as fee for this licensing action.
Respectfully submitted, GENERAL ELECTRIC COMPANY
/lr D.M. Dawson, Manager Licensing & Transportation 408*925-6330 MC 861 DMD:HAR:bn Enclosure - $150.00 check cc:
C.E. MacDonald, Chief Transportation Branch U.S. Nuclear Regulatory Commission Washington, D.C.
20555 l ti t. t(.