Category:CORRESPONDENCE-LETTERS
MONTHYEARML20205B8961999-03-25025 March 1999 Forwards Insp Rept 50-326/99-201 on 990223-25.No Violations Noted.Various Aspects of Reactor Operations,Maint, Engineering Programs & Security Were Inspected ML20202A6841999-01-22022 January 1999 Forwards Amend 4 to License R-116 & Safety Evaluation.Amend Provides Surveillance Requirement Applicable to Shutdown Conditions,Air Effluent Release Limits Consistent with Current 10CFR20 & Clarifying,Editorial Changes ML20197J7101998-12-0707 December 1998 Responds to Recent Telcon in Which NRC Requested Clarification of Few Items Re Request for Amend to TS for Univ of Ca,Irvine Triga Reactor ML20151Z2901998-09-17017 September 1998 Forwards RAI Re Changes to Univ of California,Irvine Triga Research Reactor TSs for Surveillances During Shutdown Conditions Submitted on 980824.Response Requested within 60 Days of Date of Ltr ML20217E9371998-03-26026 March 1998 Forwards Insp Rept 50-326/97-201 on 971208-11 of Triga Research Reactor.No Significant Safety Issues Were Identified ML20199L6461997-11-29029 November 1997 Forwards Licensee Rept of Items of TS non-compliance & Facility Annual Rept for 960701-970630 ML20199L6571997-11-29029 November 1997 Informs of Several Violations of TS at Facility.Corrective Actions:Full Insps & Recalibrations Have Been Carried Out & Specific Schedule Established & Posted in Facility Detailing Dates of Required Surveillance Activities Projected ML20100E5021996-02-12012 February 1996 Responds to Violations Noted in License R-116.Corrective Actions:New Channel Instruments Designed to Provide Normally Closed Set of Contacts Initiated by bi-stable,providing Same Scram & Interlock Functions as Equipment ML20094S3951995-11-29029 November 1995 Informs of Omissions Found During Review of Records in Conjunction w/on-site Insp by Region IV Re Implementation of Operator Requalification Plan ML20091L3721995-08-13013 August 1995 Forwards Univ of CA Irvine Nuclear Reactor Facility Annual Rept for Jul 1994 - June 1995. Error Identified in Distribution of Previous Annual Rept.Rept for Jul 1993 - June 1994 Encl.W/O Jul 1993 - June 1994 Rept ML20065L7601994-04-12012 April 1994 Informs That Reactor Operations Committee for Facility Failed to Meet in Period 930624-1217,in Violation of Requirements in TS Section 6.2f Due to Lack of Urgent Business,Heavy Staff Teaching Loads & Busy Schedules ML20035E9651993-03-23023 March 1993 Forwards Insp Rept 50-326/93-01 on 930216-18.No Violations or Deviations Noted.Encls a & B Withheld Ref 10CFR2.790(d) ML20034D4201992-04-21021 April 1992 Confirms Telcon W/G Miller & W Eresian Re Evaluation of Requalification Program & Licensed Personnel Scheduled for 920706-07.Requests Reference Matl for Exam at Least 60 Days Prior to Exam Date ML20058K0841990-11-26026 November 1990 Advises of Changes Re Identity of Individuals in Administration Chain ML20058J0111990-11-0909 November 1990 Ack Receipt of Transmitting Rev 2 to Physical Security Plan & Supplemental Info Re Performance Characteristics of Intrusion Alarm Sys.Changes Acceptable IR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20055G9271990-07-19019 July 1990 Provides Decommissioning Statement for Facility.Revised Estimates Will Be Reported to Commission at Intervals Not to Exceed 5-yrs ML20043H2191990-06-0505 June 1990 Forwards Updated Version of Physical Security Plan.Alarm Reporting Sys Redescribed to Agree W/Changes in Instrumentation Made Over Last 2 Yr Period.W/O Encl ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML19354E6331990-01-18018 January 1990 Responds to NRC Re Violations Noted in Insp of License R-116.Corrective Actions:All 13 Required Aspects for Each Licensed Individual Will Be Examined on Single Day & Retraining Performed Until Deficient Item Correct ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005G1241989-12-18018 December 1989 Responds to Violations Noted in Exam Rept 50-326/OL-89-01. Corrective Action:Use of Lower Ranges of Linear Channel Will Be Fully Investigated & Mode Switch Electrical Transients Will Be Cleaned & Examined ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML19324B4361989-10-25025 October 1989 Responds to NRC Re Violations Noted in Insp of License R-116.Corrective Actions:Reactor Daily Startup Checklist Modified to Require Reactor Operators to Verify Completion & Signoff of Appropriate Checklists ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML19324B4391989-05-0505 May 1989 Informs That Reactor Operations Committee for Univ of California,Irvine Nuclear Reactor Facility Failed to Meet During 880818-890131,in Violation of Tech Specs,Due to Routine Operations Discontinued,Including Staff Reduction ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20151G4091988-04-0404 April 1988 Responds to NRC Re Violations Noted in Insp Rept 50-326/88-01.Corrective Actions:Review Sheet Being Created to Assure Review of All Checklists During Insps & Reactor Supervisor & Radiation Safety Officer Reviewed Issues ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20149F4161988-01-12012 January 1988 Forwards Partial Response to NRC Compliance Bulletin 87-002, Fastener Testing to Determine Conformance W/Applicable Matl Specs, Including Procurement & Receipt Insp Program & Methods for Choosing Fasteners to Be Tested ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000326/20090091985-12-13013 December 1985 Discusses Insps on 850326-0909 & Loss of Main & Auxiliary Feedwater Event on 850609 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $900,000 ML20138M9201985-12-13013 December 1985 Forwards Addl Info Re 830623 Response to Generic Ltr 83-08, Mod of Vacuum Breakers on Mark I Containments, Per 851105 Request ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20137B7751985-10-28028 October 1985 Responds to NRC Re Violations Noted in Insp Rept. Corrective Actions:Reactor Operations Committee Established Firm Schedule for Holding Meetings & Senior Reactor Operator Exams Will Be Conducted ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20095E9131984-08-20020 August 1984 Ack Receipt of Re Proposed Research Reactor Emergency plan.Sixty-day Extension of Deadline for Response to Questions Raised by NRC Requested ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20081J1571983-10-31031 October 1983 Requests All Interested NRC Branches Be Made Aware of Changes in Mailing Address for Univ.Mail Continues to Be Sent to Old Mailing Address Which Delays Internal Distribution ML20065B4901983-02-0202 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-326/82-04.Corrective Actions:Reactor Operations Committee Met on 821202 & 830107.Future Meetings Will Be Held on Schedule 1999-03-25
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARIR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20058C6021982-07-0707 July 1982 Forwards IE Safeguards Insp Rept 50-326/82-02 on 820510-0701 & Notice of Violation ML20054L7931982-07-0202 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20052B2221982-04-15015 April 1982 Forwards IE Insp Rept 50-326/82-01 on 820323-24 & Notice of Violation ML20041B7891982-02-17017 February 1982 Forwards Revision 1 to IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors IR 05000326/19810011981-03-13013 March 1981 Forwards IE Physical Security Insp Rept 50-326/81-01 on 810226-27.No Noncompliance Noted IR 05000326/19810021981-03-11011 March 1981 Forwards IE Insp Rept 50-326/81-02 on 810226.No Noncompliance Noted ML19341C0891981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341C4361981-01-14014 January 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-02 ML19341C4421980-12-10010 December 1980 Forwards IE Insp Rept 50-326/80-02 on 801029-30 & Notice of Violation ML19339A2131980-09-24024 September 1980 Requests Endorsements & Copy of Amend 7 to Policy E-53 ML19344F1421980-08-12012 August 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-01.NRC Concluded That Licensee Actions Are Not Sufficient to Avoid Further Violations ML19344F1441980-07-0303 July 1980 Forwards IE Insp Rept 50-326/80-01 on 800519-21 & Notice of Violation ML19320C9211980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19296C3431980-02-0101 February 1980 Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. No Written Response Required ML19210D7231979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254E6801979-10-19019 October 1979 Notifies of Commission 790809 Approval to Publish Proposed Amends to 10CFR50 & 70 in Fr,Re Emergency Plans for Nonpower Reactor Licensees.Forwards Transcript of 790827 Meeting Re Impact of Proposed Safeguards Upgrade Rule ML19254E5571979-10-10010 October 1979 Forwards Amend 9 to Indemnity Agreement E-53,modifying in Course of Transportation. Requests Return of One Signed Copy ML19249D4201979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text ML19253C8321979-08-22022 August 1979 Forwards Draft Reg Guide 5.XX, Std Format & Content for Licensee Physical Security Plan for Protection of SNM of Moderate or Low Strategic Significance. W/O Encl IR 05000326/19790041979-08-14014 August 1979 Forwards IE Insp Rept 50-326/79-04 on 790713.No Noncompliance Noted.Insp Rept Withheld (Ref 10CFR2.790) ML19276G9691979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19247B9001979-08-10010 August 1979 Forwards IE Bulletin 79-19, Packaging of Low Level Radioactive Waste for Transport & Burial. Action Required ML19253A5321979-07-30030 July 1979 Forwards 790724 Fr Notice of Amends to 10CFR70 & 73 to Provide Physical Protection Measures to Detect Theft of Snm. All Affected Licensees Must Submit New Physical Security Plans Following Reg Guide 5.XX Format IR 05000326/19790021979-07-26026 July 1979 Discusses IE Insp Rept 50-326/79-02 on 790226.Notice of Violation Withheld (Ref 10CFR2.790) ML19207B6611979-07-19019 July 1979 Forwards IE Insp Rept 50-326/79-05 on 790619-21.No Noncompliance Noted ML19242D5761979-06-29029 June 1979 Forwards IE Insp Rept 50-326/79-03 on 790509-10.No Noncompliance Noted ML19246C1721979-06-22022 June 1979 Forwards IE Info Notice 79-16, Nuclear Incident at Tmi. No Action Required ML19256B3161979-05-18018 May 1979 Forwards IE Circular 79-08, Attempted Extortion - Low Enriched U ML19289F0621979-04-27027 April 1979 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp 1990-07-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20205B8961999-03-25025 March 1999 Forwards Insp Rept 50-326/99-201 on 990223-25.No Violations Noted.Various Aspects of Reactor Operations,Maint, Engineering Programs & Security Were Inspected ML20202A6841999-01-22022 January 1999 Forwards Amend 4 to License R-116 & Safety Evaluation.Amend Provides Surveillance Requirement Applicable to Shutdown Conditions,Air Effluent Release Limits Consistent with Current 10CFR20 & Clarifying,Editorial Changes ML20151Z2901998-09-17017 September 1998 Forwards RAI Re Changes to Univ of California,Irvine Triga Research Reactor TSs for Surveillances During Shutdown Conditions Submitted on 980824.Response Requested within 60 Days of Date of Ltr ML20217E9371998-03-26026 March 1998 Forwards Insp Rept 50-326/97-201 on 971208-11 of Triga Research Reactor.No Significant Safety Issues Were Identified ML20035E9651993-03-23023 March 1993 Forwards Insp Rept 50-326/93-01 on 930216-18.No Violations or Deviations Noted.Encls a & B Withheld Ref 10CFR2.790(d) ML20034D4201992-04-21021 April 1992 Confirms Telcon W/G Miller & W Eresian Re Evaluation of Requalification Program & Licensed Personnel Scheduled for 920706-07.Requests Reference Matl for Exam at Least 60 Days Prior to Exam Date ML20058J0111990-11-0909 November 1990 Ack Receipt of Transmitting Rev 2 to Physical Security Plan & Supplemental Info Re Performance Characteristics of Intrusion Alarm Sys.Changes Acceptable IR 05000326/19900021990-07-24024 July 1990 Forwards Safeguards Insp Rept 50-326/90-02 on 900709-10.No Violations or Deviations Identified.Rept Withheld Per 10CFR2.790 ML20012B8621990-03-0202 March 1990 Forwards Safeguards Insp Rept 50-326/90-01 on 900220-21.No Violations Noted ML20005E1291989-12-22022 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/89-02.Requests That Response to Item C.2 of Notice of Violation Re Failure to Conduct Annual Operating Test Be Revised ML20005D6831989-11-28028 November 1989 Forwards Exam Rept 50-326/OL-89-01 of Exam Administered on 891025-26 ML20248D7371989-09-27027 September 1989 Forwards Insp Rept 50-326/89-01 on 890828-31 & Notice of Violation.Util Requested to re-evaluate Level of Mgt Attention Necessary to Assure Continued Safe Operations ML20247H8781989-07-24024 July 1989 Advises That Senior Operator Licensing Written Exams & Operating Exams Scheduled for 891025 & 26-27,respectively. W/O Stated Encls,Including List of Ref Matl Requirements to Be Submitted to NRC by 890911 ML20205T3061988-11-0303 November 1988 Notifies of 890110 Meeting W/Region V in San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program in Region V ML20151U7581988-08-11011 August 1988 Informs of NRC Interpretation of Section 10CFR50.74(a) Re Changes in Operator or Senior Operator Status.If Operator Goes from Licensed to Nonlicensed Position W/Possibility of Reassignment to Licensed position,50.74 Does Not Apply IR 05000326/19880011988-04-11011 April 1988 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-326/88-01.Position Re Calibr of Emergency Air Sampling,Air Flow or Vol Metering Devices Stated in Paragraph C of Reg Guide 8.25 ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20148B0491988-03-0303 March 1988 Forwards Insp Rept 50-326/88-01 on 880127-29 & Notice of Violation.Expresses Concern That Licensee Not Providing Adequate Level of Mgt Attention to Facility Operations ML20235L6241987-09-25025 September 1987 Extends Invitation to Attend Region V 871110 Meeting in South San Francisco,Ca to Discuss NRC Reactor Operator Licensing Program.W/O Stated Encl ML20215C8981987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Branch Now Standardization & Non-Power Reactor Project Directorate. T Michaels Is Project Manager for Facility ML20207C3761986-12-16016 December 1986 Ack Receipt of Informing NRC of Steps Taken to Correct Items Noted in 861022 Notice of Violation. Corrective Actions Will Be Reviewed During Future Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000326/19860011986-10-22022 October 1986 Forwards Safeguards Insp Repts 50-326/86-01 & 50-326/86-02 on 860910-11 & Notice of Violation.Notice of Violation & Insp Rept Withheld (Ref 10CFR2.790) ML20205P2821986-05-0707 May 1986 Forwards Exam Rept 50-326/OL-86-01 Administered on 860408-09 ML20210H9431986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address IR 05000326/20090091985-12-13013 December 1985 Discusses Insps on 850326-0909 & Loss of Main & Auxiliary Feedwater Event on 850609 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $900,000 ML20137B7571985-11-21021 November 1985 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept ML20205E4161985-09-30030 September 1985 Forwards Insp Rept 50-326/85-01 on 850903-06 & Notice of Violation ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20197G6711984-06-12012 June 1984 Forwards IE Safeguards Insp Rept 50-326/84-01 on 840319.No Noncompliance Noted ML20058C6021982-07-0707 July 1982 Forwards IE Safeguards Insp Rept 50-326/82-02 on 820510-0701 & Notice of Violation ML20054L7931982-07-0202 July 1982 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20052B2221982-04-15015 April 1982 Forwards IE Insp Rept 50-326/82-01 on 820323-24 & Notice of Violation ML20041B7891982-02-17017 February 1982 Forwards Revision 1 to IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20032C7391981-10-13013 October 1981 Forwards Fr Notice & Press Release Re Proposed Addl Safeguards for Research Reactors IR 05000326/19810011981-03-13013 March 1981 Forwards IE Physical Security Insp Rept 50-326/81-01 on 810226-27.No Noncompliance Noted IR 05000326/19810021981-03-11011 March 1981 Forwards IE Insp Rept 50-326/81-02 on 810226.No Noncompliance Noted ML19341C0891981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19341C4361981-01-14014 January 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-02 ML19341C4421980-12-10010 December 1980 Forwards IE Insp Rept 50-326/80-02 on 801029-30 & Notice of Violation ML19339A2131980-09-24024 September 1980 Requests Endorsements & Copy of Amend 7 to Policy E-53 ML19344F1421980-08-12012 August 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-326/80-01.NRC Concluded That Licensee Actions Are Not Sufficient to Avoid Further Violations ML19344F1441980-07-0303 July 1980 Forwards IE Insp Rept 50-326/80-01 on 800519-21 & Notice of Violation ML19320C9211980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19296C3431980-02-0101 February 1980 Forwards IE Circular 80-02, Nuclear Power Plant Staff Work Hours. No Written Response Required ML19210D7231979-11-0909 November 1979 Forwards IE Info Notice 79-12A, Attempted Damage to New Fuel Assemblies. No Action Required ML19254E6801979-10-19019 October 1979 Notifies of Commission 790809 Approval to Publish Proposed Amends to 10CFR50 & 70 in Fr,Re Emergency Plans for Nonpower Reactor Licensees.Forwards Transcript of 790827 Meeting Re Impact of Proposed Safeguards Upgrade Rule ML19254E5571979-10-10010 October 1979 Forwards Amend 9 to Indemnity Agreement E-53,modifying in Course of Transportation. Requests Return of One Signed Copy ML19249D4201979-09-0707 September 1979 Forwards IE Info Notice 79-20,Revision 1, NRC Enforcement Policy - NRC Licensed Individuals. Notice Reissued to Correct Word Omission & Punctuation Error Which Changed Intent of Statement.Changed Statement Underlined in Text 1999-03-25
[Table view] |
Text
T/G R NIGg
[gk h
UNITED STATES 8\\7) y NUCLEAR REGULATORY COMMISSION 3. A '"'
REGION V 0,
il
[
1990 N. CAltFORNI A BOULEVARD
%, ' C e
SUITE 202, WALNUT CRE E K PLAZA
..e WALNUT CREE K, CALIFORNI A 94596 February 1, 1980 Docket No. 50-326 University of California Department of Chemistry Irvine, California 92717 Attn:
J. L. McGaugh Vice Chancellor Gentlemen:
The enclosed Circular 80-02 is forwarded to you for information.
If there are any questions related to your understanding of the suggested actions, please contact this office.
Sincerely, l,
CV R. H. Engelken Director
Enclosures:
1.
IE Circular No. 80-02 2.
List of IE Circulars Recently Issued 800225()
h
SSINS No.: 6830 Accession No.:
UNITED STATES 7912190657 NUCLEAR REGULATORY COMMISSION OFFICE OF INSoECTION AN9 ENFORCEMENT WASHINGTON, D.C.
20555 D
February 1, 1980 IE Circular No. 80-02 NUCLEAR POWER PLANT STAFF WORK HOURS Description of Circumstances:
Studies indicate that with fatigue, especially because of loss of sleep, an individual's detection of visual signals deteriorates markedly, the tine it takes for a person to nake a decision increases and more errors are made, and readina rates decrease.
Other studies show that fatigue results in personnel ignoring some signals because they develop their own subjective standards as to what is important, and as they become more fatiaued they ignore more signals.
Inspections of personnel performance and training since the accident at Three Mile Island, have shown that in certain situations facility oersonnel are either reouired or allowed to remain on duty for extended periods of time.
Also, complaints have been received from some licensed nuclear power plant operatcrs concerning the number of continuous hours they have been on duty.
Licensee nanagement is responsible for providing a sufficient number of trained personnel who are in the proper physical condition to operate and maintain the plant. Licensee management should review their administrative procedures covering the working hours of nuclear nower plant staff. These procedures should establish a sound policy covering workina hours for plant staff who perform safety related functions (e.g., senior reactor operators, reactor operators, health physicists, auxiliary operators, I&C technicians, key maintenance personnel, etc.)
Subconmittee ANS-3 is currently developing criteria to address the subject of operator work hours. These guidelines will become a part of ANSI N18.7 The NRC is also considering issuing requirements for administrative procedures that would control staff overtime.
Until either the ANSI Standard is issued and endorsed by NRC (via a Regulatory Guide) or separate requirements are issued by NRC, it is recommended that the following guidance be used. The guidance should be aoplied to all personnel perfoming a safety related function:
1.
Scheduled work should be limited to the following naxinum work hours:
a.
An individual should not be permitted to work more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> straight.
IE Circular No. 80-02 February 1, 1930 Page 2 of 2 b.
There should be at least a 12-hour break between all work periods.
c.
An individual should not work rare than 72-hours in any 7-day period.
d.
An individual should not work nore than 14 consecutive days without having 2 consecutive days off.
2.
In the event that special circumstances arise that require deviation from the above, such deviations should be authorized by the Station Manaaer with appropriate documentation of the cause.
Plants should be staffed and schedules developed to operate such that exceptions are not reouired.
3.
If an operator is required to work in excess of 12 continuous hours, his duties should be carefully selected.
It is preferable that he not be assioned any task that affects core reactivity or could possibly endanger the safe operation of the plant.
No written resoonse to this Circular is required.
If you desire additional inforration regarding this natter, contact the Director of the aopropriate NRC Regional Office.
IE Circular No. 80-02 Enclosure February 1, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.
Issue 80-01 Service Advice for GE 1/17/80 All licensees of Induction Disc Relays nuclear power reactor operating facilities and holders of nuclear power reactor cps 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor cps 79-24 Proper Installation and 11/26/79 All Holders of a Calibration of Cor e Spray Power Reacter OL or Pipe Break Detection CP Equipment on BWRs.
79-23 Motor Starters and 11/26/79 All Power Reactor and Contactors Failed Operating Facilities to Operate and Holders of Reactor cps 79-22 Stroke Times for Power 11/16/79 All Power Reactor Operated Relief Valves Operating Facilities and all Utilities having a CP 79-21 Prevention of Unplanned 10/19/79 All holders of Power Releases of Radioactivity Reactor OLs and cps 79-20 Failure of GTE Sylvania 9/24/79 All holders of Power Relay, Type PM, Bulletin Reactor OLs and cps 7305, Catalog SU12-11-AC
,;i'h a 12V AC Coil 79-19 Loose Locking Devices 9/13/79 All Holders of Power on Ingersoll-Rand Pumps Reactor OLs and cps 79-18 Proper Installation of Target 9/10/79 All Holders of Power Rock Safety-Relief Valves Reactor OLs and cps 79-17 Contact Problem in SB-12 8/14/79 All Power Reactor Switches on General Electric Licensees with a CP Company Metalciad Circuit and/or OL Breakers