Advises of B&W Analysis Completion Per Commission May 1979 Orders Re Integrated Control Sys Failure Modes & Effects
ML19296B835
Person / Time
Site: Rancho Seco
Issue date: 08/22/1979
From: Capra R
NRC - TMI-2 BULLETINS & ORDERS TASK FORCE
To:
NRC - TMI-2 BULLETINS & ORDERS TASK FORCE
Shared Package
ML19296B831 List:
References
FOIA-81-149 NUDOCS 8002220216
Download: ML19296B835 (1)


Text

.

26 n*Eag f(4s 70, UNITED STATES a

NUCLEAR REGULATORY COMMISSION E

WASMNGTON. D. C. 2C555

,e e,

a

/

August 22, 1979

~

MEMORANCUM FOR: DISTRIBUTION FROM:

R. A. Capra, B&W Project Manager, Project Management Group Bulletins & Orders Task Force

SUBJECT:

INTEGRATED CONTROL SYSTEM RELIABILITY ANALYSIS 1

As part of the long-tem portion of the Commission Orders of May,1979, each of the B&W operating plants was directed to perform a failure modes and effects analysis of the integrated control system (ICS), B&W performed this analysis for each licensee.

2.

B&W has completed the analysis and forwarded ten copies of their repcrt,

" Integrated Control System Reliability Analysis - BAW1564 - August 1979,"

via a letter from J. H. Taylor (B&W) to D. F. Ross,(NRC) dated August 17, 1979.

3.

The organization who will perfom the review of this document has not been determined yet; however, I am making distribution of the ten copies we have received as indicated below.

I have requested that 50 additional copies be reproduced for further distribution.

~~2 0.CW

h. A. Capra, B&W Project Manager Project Management Group Bulletins & Orders Task Force Distribution:

AmmmmdmP letter only Novak (1)

G. Mazetis C. Nelson Heltemes (1)

P. Matthews R. Ingram Israel (1)

D. Thatcher W. Gammill Rosztoczy (1)

F. Ashe D. Eisenhut Satterfield (1)

P. Norian S. Lewis Capra (1)

R. Reid L. Brenner Docket files (1)

G. Vissing M. Mulkey POR (1)

D. Garner D. Davis

~

Reproduction (1)

M. Fairtile 2IG 8002220

27 Babcock &Wilcox

,,,,, o,,,,,,,,, o,,,,

P.o. Box 1260. Lyneneurg. Va. 24505 Teleonone: (804) 384 5111 August 17, 1979 Dr. D. F. Ross, Jr.

Deputy Director Division of Project Management Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washingten, D.C.

20555

Subject:

Integrated Control System Reliability Analysis Gentlemen:

Transmitted herewith are ten copies of the Integrated Control System (ICS) Reliability Analysis, BAN-1564.

B5W performed this analysis at the request of the NRC, cased on concerns steming from the TMI-2 incident. Although the ICS perfot ned exactly as designed during the TMI-2 incident, it was brought under scrutiny since it was both the control system for Auxiliary Feedwater and one of the major differences

. between B5W and other FWR designs. 'Ihis analysis supports B5W's previous position - the ICS is a reliable control system that promotes NSS availability by maintaining the plant on line during normal and upset conditions, providing runbacks, and minimi:ing reactor trips.

If you have any questions, please call (Ext. 2817).

Ve O M y yours,,

(

?.

/

7y3 '

1 James H. Taylor.'

Manager, Licensing JKT:dsf Encl.

cc:

R. B. Borsum (B5W)

R. A. Capra (NRC)

B5W Owners Group Subcomittee (list attached) by 900 9:210 2 ? S The Baccock & Wilces Company / Estachsned 1867

28 Babcock &Wilcox BSW Owners Grouc TMI-2 Subcommittee FPC CPC Florida Power Corporation Consumers Power Company P. O.

Box 14042 1945 West Parnall Road St. Petersburg, FL 33733 Jackson, MI 49203 Attn: E. C. Simpson (Bert)

Attn:

T. J. Sullivan (Terry)

DPC0 GPU Duke Power Company GPU Service Corporation P. O. Box 33189 260 Cherry Hill Road Charlotte, NC 28242 Parsippany, NJ 07054 Attn: D. C. Holt (Dave)

Attn:

R. F. Wilson (Dick) eAUD Sacramento Municipal Utility District 6201 S Street Sacramento, CA 95813 Attn:

S. Anderson (Stan)

APSL Arkansas Power 5 Light Company P. O. Box 551 Little Rock, AR 72203 Attn: D. G. Mardis (Dave)

TECO.

Toledo Edison Company Edison Plaza 300 Madison Avenue Toledo, OH 43652 Attn:

C. R. Domeck (Chuck)

MET ED Metropolitan Edison Company P. O. Box 542 Reading, PA 19603 Attn:

J. F. Fritzen (Jeff)

(

7.

29 Babcock & Wilcox p~, g,,,nc, g,cx P.O. Sex 1260 t.ync ::ar;;.V. 245ti

~

Te!:::hene:(534)23 5111 April 28, 1979*

Mr. Harold R. Denton, Di rector

~

Office of Nuclear Reactor Regulation '.

, U.S. Nuclear Regulatory Cor: mission 7920 Norfolk Avenue

~

Bethesda, Maryland 20555 Mr. Denton:

Subj ect:

Integrated Control System As committed by Babco'ck & Wilcox in J. H. MacMillan's letter to you on April 26, 1979, please f.ind attached both the schedule and scope for a Reliability Analysis of the Integrated Control System and the schedule for developing an Auxiliary Feecwater-Contrcrt incependent f.

of the Integrated Control Ssytem.

It is our undc si nding that the ccm'mitment to complete these items is not a prer,r,s M ' te to plant restart. -

If you have any questions, please call me (Ext. 2'817).

--~

Very' truly yours, -

, -4

',.w.

.2.-

J. H. Taylor F.anager, I.icensing

'c

~

JHT/wl

~~

R. S. Borsum (B&V, Bethesda) cc:

~

bec:

E. R. Kane tXT.ET. Suhrke't R. E. Ham

, D. D. Fai rbrother...

C' J. Brazill t

R. E. Vascher DUPLICATE DOCUMENT J. H. MacMillan Entire document previourly entered into system under:

~

nN n 9 E d 3 as3 54,

~

p"g g

n-a No. of pages:

The Babcock &

33 APPENDIX C: UTILITY SUBMITTALS RELATING TO THE B&W RELIABILITY ANALYSIS a

i 4

4 9

I

c '- /

34

. 'h,

Dunz Powra CodrPsT

[

Powra Bun.nneo 422 Socra Cacucu Srazzr, CainmrTz. N. C. as24a wiwa= o...a um. 4 August 31, 1979 WCE P.tSeOfe?

TcLce=o.c assa ?ce

~

se 4. P.

.we,...

s r2..e e a Mr. Harold R. Denton, Director D[F h[D ff Office of Nuclear Reactor Regulation Q

d bll ]UJd ~

U. S. Nuclear Regulatory Cot =Lission Washington, D. C.

20555 Attention:

Mr. D. F. Ross, Jr., Director Bulletins and Orders Task Force Re: Oconee Nuclear Station Docket Numbers 50-269, -270, -287 4

Dear Mr. Denton:

With regard to your letter dated August 21, 1979 concerning identification and resolution of long-term generic issues related to the Coc:=ission Orders of May 1979, the following infor=ation is provided:

1.

Failure c: ode and effects analysis of the Inteerated Control System.

The Integrated Control System Reliability Analysis, submitted by Babcock and Wilcox in a letter d ted August 17, 1979 has been reviewed by Duke Power Cenpany. This dec =ent is considc. red to be applicable to the sys-tes at Oconee Nuclear 5:... don.

2.

Continued ooerator trei :.: and drilling.

The response to this a.

111 be submitted by Septe=ber 21, 1979.

3.

Uperade of the antici:v....

reactor trip to safety grzie.

No additional infor=:.::...

raquested.

4 Auxiliarv/e=creenev feci er system reliability analyses.

Duke Power Company vill pc.rticipate in the auxiliary feedvater syste reliability analyses preg:am proposed by B&W in a letter dated Aug st 16, 1979 from J. H. Taylor to D. F. Ross, NRC. A final report of the results of the analysis for Oconee vill be provided by December 3,1979.

g gn n

'g% f n3 a

L

,qo y o c o e n