ML19296B801

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 79-110/03L-1
Date released: 11/06/2019 Download: ML19296B801


Updated LER 79-110/03L-1:on 791218,during Reactor Shroud Level Channel Calibr,Switch 1 on 1-B21-LITS-NO37 Found Out of Calibr.Caused by Bump from Scaffolding Affecting Calibr of Brooks Converter.Switch Recalibr & Returned to Svc
ML19296B802
Person / Time
Site: Brunswick 
Issue date: 01/29/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B802 (2)
Forwards Updated LER 79-110/03L-1
ML19296B800
Person / Time
Site: Brunswick 
Issue date: 01/29/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B800 (1)