ML19296B429

From kanterella
Jump to navigation Jump to search
Forwards LER 80-013/03L-0
Date released: 11/06/2019 Download: ML19296B429


LER 80-013/03L-0:800114,during Surveillance Testing,Reactor lo-lo-lo Level Switch a Operated Improperly.Caused by Improper Closing of Level Switch Contact at Switch Set Point.Switch Replaced
ML19296B434
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/12/1980
From: W. Verne Childs
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19296B434 (2)
Forwards LER 80-013/03L-0
ML19296B428
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/12/1980
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19296B428 (1)