Monthly Operating Repts for Jan 1980
ML19296B358
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/12/1980
From: Hunstad A
NORTHERN STATES POWER CO.
To:
Shared Package
ML19296B324 List:
References
NUDOCS 8002200454
Download: ML19296B358 (7)


Text

-. - -..

!'AP't ATTM' STP'MM1" 07 0"ERn ING EXPERIENCE POCKET MO. 50 '282 UNIT Prairin Island No. 1 DATR 800202

~. A. Hunstad Cof?)T.ETED BY A

TELETT*0NE 612-388-4767 o

Q MONTH January 1980 G

n The unit was base loaded this month. On 1-23 a forced power reduction 2,

8 to 68% power was made when one diesel generator and one diesel cooling Z

water pump were inoperable. On 1-31 a reduction was taken to 50% power for the monthly turbine valves test.

SPENT FUEL STORAGE UPDATE Fuel assembli in each core - No change Fuel assemblis in the spent fuel storage pool - 320 Licensed spent fuel storage pool capacity - No change Date of last refueling that can be discharged with present capacity - No change 800 woo 46Y

DAILY UNIT POWER OUTPUT DOCKET NO. 50-282 UNIT Prairie Island No. 1 DATE 800201 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH January 1980 DAY AVERACE LOAD MWe-Net DAY AVERACE LOAD MWe-Ne_t e

1 489 17 492 S

2 491 18 491 j

{

3 488 19 492 9

{

4 491 20 488 5

491 21 489 6

488 22 489 7

489 23 465 8

467 24 483 9

488 25 486 10 487 26 485 11 484 27 484 12 487 28 485 13 487 29 486 14 490 30 485 15 488 31 439 16 489 Average loads above 503 MWe-Net are,due to ecoler condenser circulating water.

4 OPERATING DAT4 REPORT DOCKET NO 50- 282 DATE 800201 COMPLETED BY A. A. Hunstad OPERATING STATUS TELEPHONE 612-388-4767 1.

Unit Name:

Prairie Island No.

1 Notes 2.

Reporting Period:

January 1980 3.

Licensed Thermal Power (MWt):

1650 4.

Nameplate Rating (Gross MWe):

593 5.

Design Electrical Rating (Net MWe):

530 6.

Maximum Dependable Capacity (Gross MWe):

H4 N

7.

Maximum Dependable Capacity (Ne". MWe):

593 g

8.

If Changes Occur in Capacity Ratings (7tems Number 3 Through 7) Since Last Report:

Give Reason:

9.

Power Level To Which Restricted, Tf Any (Pet MWe):

10.

Reasons for Restrictions, if Anr:

~

This Month Yr-To-Date Cut.olative 11.

Hours In Reporting Period 744 744 53712 12.

Number Of Hours Reactor Was Critical 744.0 744.0 41952.4 13.

Reactor Reserve Shutdown Hours

_ _ _0. 0 0.0 5531.9 14.

Hours Generator On Line

,_744.0 744.0 40867.5 15.

Unit Reserve Shutdown Hourr, 0.0 0.0 0.0 16.

Gross Thermal Energy Generated (!F.,'H) 1214492 1214492 63293486 17.

Gross Electrical Energy Generated (MWID

,_ 384920 384920 20538590 18.

Net Electrical Energy Generated OWH) 361248 361248 19200490 19.

Unit Service Factor

_ 100.0 100.0 76.1

'00.0 76.1 F

Unit Availability Factor 100.0_

1 21.

Unit Capacity Factor (Using MDC Net) 96.5 96.5 71.0 22.

Unit Capacity Factor (Using DER Net)

__.91.6 91.6 67.4

23. Unit Forced Outage Rate 0.0 0.0 13.5

'4.

Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Er.ch):

Refueling. Summer 1980, 5 weeks 25.

If Shut Down at End Of Report Period, Estimated Date of Startup:

UNIT S!IUTD0!NS AND PO'1ER REDUCTIONS D00KET NO.

50- 282 REPORT MONTH January 1980 UNIT NAME Prairis Island No.1 DAT,,. 800201 c

COMPLii?2D 3Y A. A. Hunstad _ _.. _

T2LEPiiOSE 512-133-4767 5 {%[u Lica usa

{ j.$

s n

a Causa S Caccactiva ae

.a 3.

37 0.38 Eva.; r Date t

5m Actica to 4

j N

3 U S' R2part J

$, S 5$

Prevant Ja,:urraaca uo c)

.c a c>

r.n o.

o 55

%5" s

n g

u 0

=

e

.o 800123 F

0.0 A

N/A 80-6 EB PIPEXX

. D2 Diesel Generator and No.12 m

l Diesel Cooling Water Pump became H

3 g

l inoperable at the same time. Ordei -

3 l ly shutdown was begun and was en l diesel generator was again made terminated at 68% power when the Q

m l

g

. operable r

=@

i EM rE559 i

%QQQ duu:

'ff$

NW ClO' p

F: Forced Reason Method:

Exhibit.G-In-S: Scheduled A-Equipment Failure (Explain) 1-Manual structions for B-Maintenance or Test 2-Manual Trip Preparation of C-Refueling 3-Automatic Trip Data Entry Sheets D-Regulatory Restriction 4-Other (Explain) for Licensee Event E-Opers'.sc Training & License Examination Report (LER) File F-Administrauive (NUREG-0161)

G-Operational Error (?xplain) 5 H-Other (2xplain Exhibit 1 - Gara 3'r:2

F An9APTtir, RTIVMM'? OF (m!styrnir, P.XPERIENCE P3CKET t:0. 50- 306 PtiT.T Preirin Island Nn. 2 DATE 800201 C^i!DT.ETFD PN A. A. Kunstad TELEFi:0NE 612-308-4767 o

>y M0?iTH January 1980 S

The unit was removed from service at 2121 on 1-2 for the cycle 4-5 refueling, planned to last about 41/2 weeks. On 1-17 a decision was made to replace the LP rotor spindles with spares; this added several N

days to the outage. Steam generator eddy current testing revealed degradation of some tubes. Additional examinations and tube plugging, and pull 1ng of one t.ube, added a few more days. The unit is scheduled for restart on February 17th.

DAILY UNIT POWER OUTPUT DOCKET NO. 50- 306 UNIT Prairie Island No. 2 DATE 800201 COMPLETED BY A. A. Hunstad TELEPHONE 612-388-4767 MONTH January 1980 DAY AVERACE LOAD MWe-Net DAY AVERACE LOAD MWe-Net o

1 420 17

-2 2

353 18

-2 x

7 3

-17 19

-2 G

9_

4

-7 20

-2 5

-4 21

-2 6

-4 22

-2 7

-3 23

-2 8

-3 24

-2 9

-2 25

-2 10

-2 26

-2 11

-2 27

-2 12

-2 28

-2 13

-2 29

-2 14

-2 30

-2 15

-2 31

-2 16

-2 Ave..ge loads above 500 MWe-Net are due to cooler condenser circulating water.

OPERATING DATA REPORT DOCKET NO 50- 306 DATE 800201 COMPLETED BY A. A. Hunstad OPERATING STATUS TELEPHONE 612-388-4767 1.

Unit Name:

Prairie Island No. 2 tes 2.

Reporting Period:

January 1980 3.

Licensed Thermal Power (MWt):

1650 4.

Nameplate Rating (Gross MWe):

593 5.

Design Electrical Rating (Net MWe):

530 6.

Maximum Dependable Capacity (Cross MWe): 531 U

7.

Maximum Dependable Capacity (Net MWe):

500 g

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report:

Give Reason:

=

9.

Power Level To Which Restricted, Tf Any (Pet MWe):

Di

'10.

Reasons for Restrictions, if Any:_,, _

This Month Yr-To-Date Cur.nlative 11.

Hours In Reporting Period 744 744 44830 12.

Number Of Hours Reactor Was critical 47.9 47.9 39176.9 13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On Line

_, 45.3 45.3 38446.3 15.

Unit Reserve Shutdown llours

_,, 0.0 O.0 0.0 16.

Gross Thermal Energy Generated (!!','ft) 60728 60728 59643231 17.

Gross Electrical Energy Generated (FWID 20010 20010 19074140 18.

Net Electrical Energy Generated OWH) 16461 16461 17855093 19.

Unit Service Factor 6.1 6.1 85.8 20.

Unit Availability Factor 6.1 6.1 85.8 21.

Unit Capacity Factor (Using MDC Net) 4.4 4.4 79.7 22.

Unit Capacity Factor (Using DER Net) 4.2 4.2 75.2 23.

Unit Forced Outage Rate 0.0 0.0 4.9

'4.

Shutdowns Scheduled Over Next 12 Months (Type, Date and Duration of Ecch):

25.

If Shut Down at End Of Report Period, Estimar.ed Date of Startup:

Ann?17

.