Text
,.
bc: LER/ Control Building Distribution LlS TNP: GOV REL F:NRC: Licensee Event Report, Reportable Occurrence TNP: GOV REL F:NRC: Licensing, Control Building TNP:COV REL F:NRC:PGE to NRR C
Pcetland General SectricCerrpany i- %Ei 15 "cnac; Mem an:rtvee es e-o February 9, 1980 Trojan Nuclear Plant Docket 50-344 License h7F-1 Director of Nuclear Reactor Regulation ATTN:
Mr. A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors U. S. Nuclear Regulatory Commission
'n'ashington, D. C.
20555
Dear Sir:
Our response dated December 31, 1979 to NRC Staff Question 6 of December 29, 1979 regarding LER 79-15 indicated that the range of transverse shear stress in walls due to interstory displacement would be confirmed to be 1 psi to 3 psi (+1 psi). The results of that confimation for Auxiliary Building walls were reported in my letter dated January 31, 1980.
All of the walls in the Control-Auxiliary-Fuel Building Complex have now been reviewed and excepting those wall panels listed on the attached Tables 6-1, 6-2 and 6-3, =aximum transverse shear stresses due to interstory displacements are below 4 psi, with the majority being in the range of 0.5 psi to 2.0 psi.
Evaluations of such shear stresses for walls not modeled in STARDYNE are being finalized. Results of these evaluations will be reported on February 15, 1980, when we report on ;he combined interface shear stresses for these walls. That submittal will also report the combined interface shear stresses for the wall panels referenced in Tables 6-1, 6-2 and 6-3.
Sincerely,
/s/ D. J. Broehl 7)
DJB/L4E/4mg6A29 Attachment c:
Mr. R. H. Engelken, Director' U. S. Nuclear Regulatory Commission Region V Mr. Lynn Frank, Director State of Oregon y
Department of Energy 9\\
\\
Control Euilding Service List 121 SW Sa5 men Steat. Po tard. Cp 972"A 80022 0 N-)
0
TABLE 6-1 LOCATIONS IN THE AUXILIARY BUILDING WHERE INTERFACE SHEAR STRESSES DUE TO ITIERSTCRY DISPLACEMENTS EXCEED 4 PSI Interface Thickness Shear Stress
- Elevation
'4all Location (inches)
(psi) 93 ft.-105 ft.
46 Eetween N and H 24 4.32 61 f t.-77 f t.
54 Between L and K 48 5.30 45 ft.-61 ft.
55 Between N and H 28 4.40
- Due to interstory displacement.
LWE/gah/4mg6A30
TABLE 6-2 LOCATIONS IN THE FUEL BUILDING WHERE INTERFACE SHEAR STRESSES DUE TO INTERSTORY DISPLACEMENTS EXCEED 4 PSI Interface Shear Thickness Stress
- Elevation Wall Location (Inches)
(psi) 61 ft.-77 ft.
54 Between B & C 14 7.25
- Due to interstory displacement.
LkI/4sa732
IABLE 6-3 LOCATIONS IN THE CONTROL BUILDING 'n"dERE INTERFACE SHEAR STRESSES DUE TO INTERSTORY DISPLACEFiENTS EXCEED 4 PSI Maximus Interface Shear Thickness Stress
- Elevation Wall Location (Inches)
(psi) 45 ft.-93 ft.
55 Between N & N' 32 6.53 93 ft.-117 ft.
55 Between N & N' 34 7.83 105 ft.-117 ft.
55 Between N' & O 34 7.16 105 ft.-117 ft.
55 Between 0 & Q 34 8.37 77 ft.-93 ft.
55 Between 0 & Q 32 4.23 45 ft.-93 ft.
55 Between Q & R 32 8.00 93 ft.-117 ft.
55 Between Q & R 34 12.05 45 ft.-61 ft.
49 Between N &.N' 27 8.54 45 ft.-61 ft.
46 Between N & 0 27 6.57 61 ft.-77 ft.
N Between 46 & 55 32 & 26 5.70 93 ft.-117 ft.
N Between 46 & 55 26, 34 & 41 6.92 93 ft.-117 ft.
R Between 51 & 54 34 7.14
- Due to interstory displacement.
LWE/mg/4sa731
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
Docket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
et al
)
(Control Building Proceeding)
)
(Trojan Nuclear Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on February 11, 1980, Licensee's letter to the Director of Nuclear Reactor Regulation dated February 9,1980 with information regarding LER 79-15 has been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first class mail.
Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Appeal Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, D. C.
20555 Dr. Kenneth A. McCollom, Dean Docketing and Service Section (3)
Division of Engineering, Office of the Secretary Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C.
20555 Stillwater, Oklahoma 74074 Joseph R. Gray, Esq.
Dr. Hugh C. Paxton Counsel for NRC Staff 1229 - 41st Street U. S, Nuclear Regulatory Cormission Los Alamos, New Mexico 87544 Washington, D. C.
20555 Atomic Safety and Licensing Board Lowenstein, Newman, Reis, Axelrad & Toll Panel 1025 Connecticut Ave., N. W.
U. S. Nuclear Regulatory Commission Suite 1214 Washington, D. C.
20555 Washington, D. C.
20036
CERTIFICATE OF SERVICE Frank W. Ostrander, Jr., Esq.
Mr. David B. McCoy Richard M. Sandvik, Esq.
348 Hussey Lane Aseistant Attorney General Grants Pass, Oregon 97526 State of Oregon Department of Justice Ms. C. Gail Parson 500 Pacific Building P. O. Box 2992 520 S. W. Yamhill Kodiak, Alaska 99615 Portland, Oregon 97204 Mr. Eugene Rosolie William Kinsey, Esq.
Coalition for Safe Power Bonneville Power Administration 215 S. E. 9th Avenue P. O. Box 3621 Portland, Oregon 97214 Portland, Oregon 97208 Columbia County Courthouse Ms. Nina Bell Law Library 728 S. E. 26th Avenue Circ it Court D.oom Portland, Oregon 97214 St. Helens, Oregon 97051 Mr. John A. Kullberg Dr. Harold I. Laursen Route 1, Box 250Q 1520 N. W.
13th Sauvie Island, Oregon 97231 Corvallis, Oregon 97330
.Ye M V J. W. Lentsch Manager, Generation Licensing & Analysis Department Portland General Electric Company Dated: February 11, 1980 mg/sa6B17