ML19296B341

From kanterella
Jump to navigation Jump to search
Forwards LER 80-011/03L-0
Date released: 11/06/2019 Download: ML19296B341


LER 80-011/03L-0:on 800121,during 10-minute Run of HPCI Auxiliary Oil Pump,Stoppage Occurred When Switch Moved from Start to Auto Position.Caused by Loose Wire on RTGB Control Switch.Wire Reattached & Tightened
ML19296B342
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B342 (1)
Forwards LER 80-011/03L-0
ML19296B339
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 02/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19296B339 (1)