ML19296B162
| ML19296B162 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/23/1980 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Reid R Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19296B163 | List: |
| References | |
| NUDOCS 8002200194 | |
| Download: ML19296B162 (10) | |
Text
l f))(}-
. pe"%jo, a,
y..
UNITED ST ATEs y,.,,
i NUCLEAR REGULATORY COMMISSION
,.g l
WASHINGTO N. D. C. 20555 JAN 0 31980 MEMORANDUM FOR:
R. W. Reid, Chief, Operating Reactors Branch #4, 00R FROM:
G. Lainas, Chief, Plant Systems Branch, D0R
SUBJECT:
SAFETY EVALUATION REPORT, FIRE PROTECTION PROGRAM REVIEW, MILLSTONE UNIT 2 (TAC 11117)
Plant Name: Nillstone Unit 2 Licensee:
Northeast Utilities Docket No.:
50-336 Responsible Branch: ORB #4 Project Manager:
M. Conner Review Branch:
PSB Requested Completion Date: August 31, 1979 Status:
See Enclosure 1 Our initial Safety Evaluation Report (SER) dealing with fire protection at Millstone Unit 2, was issued on September 19, 1978.
In Section 3 of the SER certain items were identified as incorolete and requiring further information from the licensee and evaluation by the staff. We have completed our review of information dealing with these incomplete items as provided in licensee responses of April 11, May 18, July 19, July 31, October 9, November 21, and December 4,1979.
The results of our review are enclosed. is the Status of each of the incomplete items. is our evaluation. We find that additional information is required from the licensee to resolve three items.
This request fcr infor ation and the requirement should be transmitted to the licensee requesting a response within 20 days.
Should the licenseechoose to not satisfy the requirement, a meeting should be arranged within the same 20 days with appropriate management individuals prior to initiating an order.
N]g G.#i.ainas, Chief
/
Plant Systems Branch Division of Operating Reacto s cc:
See page 2 d d O 20 0til14
! yn 2 31980
Contact:
L. Derderian X-27690
Enclosures:
As stated cc w/ enclosures:
D. Eisenhut R. Vollmer W. Gammill V. Benaroya P. Matthews G. Lainas R. Ferguson T. Wambach L. Derderian M. Conner PSB Section C M. Antonetti, BNL R. Hall, BNL
ENCLOSURE 1 RESOLUTION OF INCOMPLETE ITEMS - STATUS MILLSTONE UNIT 2 LICENSEE RESPONSE STAFF EVALUATION DUE 3.1.1 Fire Detection System Complete 3.1. 5 Water Suppression System Complete 3.1.14 Protection of Redundant Conduit Complete 3.2.1 Cable Spreading Area Complete 3.2.2 Protection of Redundant Cable Trays Complete 3.2.3 Smoke Detection System Tests 1.
In-Situ - Acceptance Cr'teria 2/1/80 (BN')
2.
Ber.cn Tests Infor-ra-ion 20 days 3.2.4 Cable Fire Barrier Pene-tration Test Data Information 20 days 3.2.5 Primary Coolant Pump Lube Oil Fire Hazard Requirement 20 days