ML19296A172

From kanterella
Jump to navigation Jump to search
IE Insp Rept 99900521/78-03 on 781127-30.Deviation Noted: Failure to Follow Procedures Controlling Issuance of Addendums to Specs
ML19296A172
Person / Time
Issue date: 12/18/1978
From: Brickley R, Brown R, Hale C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19296A164 List:
References
REF-QA-99900521 NUDOCS 7902080331
Download: ML19296A172 (10)


Text

'

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No.

99900521/78-03 Program No.

51200 Company:

Bechtel Power Corporation Los Angeles Power Division P. O. Box 60860 Terminal Annex Los Angeles, California 40060 Inspection Conducted: November 27-30, 1978.

Inspectors: T / M S u I

/X//T IT R. H. Brickley, Principal Inspector, Vendor Date Inspection BrancV A bd&3

/

w gw R. L. Brown, Principal Inspector, Vendor Date Inspection Branch m

/

/

Approved by:

b

[O ~ h 7(

C. Jrma]e, Cnief, Program Evaluation Section, Date Vendor Inspection Branch Summary Inspection on November 27-30, 1978 (99900521/78-03)

Areas Insoected:

Implementation of the requirements of Title 10 CFR 50, Appendix S, in the areas of design inspection, design change control, design corrective action, and action on previous inspection findings. The inspection involved fifty-five (55) inspector-hours on site by two (2)

NRC inspectors.

Results:

In the four (4) areas inspected there v,ere no unresolved items identified in any of the areas, no deviations identified in three (3) of the areas, and the following identified in the remaining area.

Deviation:

Design Change Control - Two (2) examples of failure to follow procedures controlling the issuance of addendums to specifications.

790208033l4

Bechtel Power Corporation Los Angeles Power Division in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, i.

,I

),

1 L.v L,

. d 0.J?q\\0 Uldis orapovs, Glei Vendor Inspection Brhnch Enclosures :

1.

Notice of Deviation 2.

Inspection Report No. 99900521/78-03 cc: Arizona Power Service Company Southern California Edison

Attachment (a) 1/15/79 Page 2 of 2 Corrective Action 1.

Action taken to correct the deviation Addendum 7 to Specification 5023-200-3 deletes the reference to SCN C-09 from Addendum 6 ar.d incorporates SCN C-09 in Addendum 7.

An audit by Project Quaiity Assurance on January 5, 1979 has demonstrated that the deviation cited in item B of your letter is not a single isolated incident.

Therefore, further action is being taken by having each responsible engineer review documents under their cognicance to determine the extent to which this deviation exists. Any deviations noted by this purge will be immediately corrected.

2.

Action taken to orevent recurrence Quality Er.gineering and Quality Assurance Supervisors have reevaluated their document review techniques and have by memo advised those individuals responsible for the review of specifications of the necessity to review all documentation noted for incorporation to assure that the elements described in those documents appear in the specification addendum or revision.

3.

Action comoletion dates The action described in 1 and 2 above will be completed by February 27, 1979.