Forwards Wppss Project Nos 3 & 5 Groundwater Drainage Sys Design Parameters-3rd Suppl.Also Provides Increased Piezometer Coverage of the Excavation Perimeter.Quantitative Eval of Drainage Sys Premature Due to Incomplete Data
ML19296A089
Person / Time
Site: Satsop
Issue date: 12/19/1978
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML19296A090 List:
References
NUDOCS 7812290148
Download: ML19296A089 (3)


Text

-

. Wy P W shington Public Power Supply System A JOINT OPERATING AGENCY S

r. o. . . . . . . 3ooo a.o.w....... w., .c,.u o.w.......... 3 2 -o .(so.)21s.sooo December 19, 1978 G03-78-1182 Docket Nos. 50-508 and 50-509 Director of Nuclear Reactor Regulation ATTENTION: 0. D. Parr, Chief Light Water Reactors Branch No. 3 U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

WPPSS NUCLEAR PROJECT N05. 3 AND 5 GROUNDWATER DRAINAGE SYSTEM DESIGN PARAMETERS - THIRD SUPPLEMENT

)

References:

1) Letter, D. L. Renberger to 0. D. Parr, NRC Review of WNP-3 Groundwater Drainage Design Parameters, dated March 7,1978
2) Letter, D. L. Renberger to 0. D. Parr, Groundwater Drainage System Design Parameters - First Supple-ment, dated June 1, 1978
3) Letter, D. L. Renberger to 0. D. Parr, Groundwater Drainage System Design Parameters - Second Supple-ment, dated September 1, 1978

Dear Mr. Parr:

The above referenced letters transmitted the reports of WPPSS' Engineer, Ebasco Services, Incorporated, which provided analysis of the groundwater drainage system and all pertinent data available. Reference (1) also pro-vided the groundwater drainage system final design and other related infonnation bearing on system performance.

Tne attached report of our Engineer provides an update of the groundwater data provided by references (1), (2) and (3), an analysis of that data, and increased piezometer coverage of the excavation perimeter. Quanti-tative evaluation of the adequacy of the groundwater drainage system is premature at this time due to incomplete data.

Installation of the WNP-3/5 groundwater drainage system is now complete.

Groundwater flow measurements will provide usable data when the system is sealed from surface water infiltration by concrete placement.

q [)([O Dh [\

0. D. Parr, Chief Page Two a

Although no quantitative conclusions can be drawn at this time regarding the adequacy of the system design, it is apparent the parameters used in developing ~the final design, as discussed in the PSAR, are conserva-tive and the system will function as required.

WPPSS' next supplementary report on groundwater drainage system parameters will include data from 16 additional WNP-5 piezometers Should you desire further information during the interim period, please centact our Mr. R. C. Douglas.

Very truly yours, oO W D. L. RENBERGER Assistant Director S;c.cccti;  :-d Technology DLR: RCD:ds cc: D. Smithpeter (BPA)

N. S. Reynolds - DeBevoise & Liberman

Letter, D. L. Renberger to 0. D. Parr

. Groundwater Drainage System Design Parameters - Third Supplement STATE OF WASHINGTON ss COUNTY OF BENTON )

D. L. RENBERGER, Being first duly sworn, deposes and says: That he is the Assistant Director, Eccatica rd Technology, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.

DATED /f , 19 2

-D *)

J D. L. RENBERGER' On this day personally appeared before me D. L. RENBERGER to me known to be the individual who executed the foregoing 3trument and acknowledged that he signed the same as his free act and deeo for the uses and purposes therein men tioned.

GIVEN under my hand and seal this ,/ M day of Mm dad _, 1978.

W @dC Ndtary Public in and fot>the State of Washington -

Residing at M 4 e l /nce [.

/