ML19295B997
| ML19295B997 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Byron, Braidwood, Quad Cities, Zion, LaSalle |
| Issue date: | 01/16/1978 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Brian Lee COMMONWEALTH EDISON CO. |
| References | |
| NUDOCS 8010150695 | |
| Download: ML19295B997 (1) | |
Text
.
I s
Docket No "n in 237, 50-249,'
50-254, 50-5, 50-295, 50-304, 50-373, 50-374, 50-454, 50-455, JAN 16.8 50-456, 50-457 Connonwealth Edison Company ATTN:
Mr. Byron Lee, Jr.
Vice President P.O. Box 767 Chicago, IL 60690 Gentlemen:
Enclosed is IE Eulletin No. 78-01 which requires action by you with regard to your power reactor facilities having an operating license or a construc-tion permit.
Should you have any questions regarding this Bulletin or the actions required, please contact this office.
Sincerely, James G. Keppler Director
Enclosures:
1.
IE Bulletin No. 78-01, w/attachnent 2.
List of IE Bulletins inaued during last 12 months cc w/encls:
B. B. Stephenson, Station Superintendent N. Kalivianskis, Station Superintendent N. Wandke, Plant Superintendent L. J. Burke, Site Project Superintendent Gunnar Sorenson, Site Project Superintendent
. R. Cosaro, Project Superintendent j}CentralFiles
/
Reproduction Unit NRC 20b 0'l PDR
- ~/
Local PDR NSIC TIC Anthony Roisman, Esq., Attornev
/
N orries
- RIII
/-
RU..
RIII s u...
- Fiorell
. _.}lai an__
er J
o.,.*
.1116L18.
NIC FORM 318 (9 76) NRCM 0240 Y ut s. oovranuswr rasmine orrects so,e - eas eas B010150[9f g
January 16, 1978 IE Bulletin No. 78-01 FLAMMABLE CONTACT-ARM RETAINERS IN G.E. CR120A RELAYS Description of Circumstances:
On April 18, 1977, a. fire was discovered in a relay cabinet in the Peach Bottom Unit 3 facility. The fire damaged eight relays,-type CR120A, manufactured by the General Electric Company. The fire was investigated by the licensee, the Philadelphia Electric Company, who concluded that it was caused by an overheated relay coil that ignited the relay's plastic contact-am retainer. Subsequently, on July 29, 1977, fire damage was discovered in a relay cabinet during surveil-lance testing in the Peach Bottom Unit 2 facility. This fire da= aged 18 G.E. type CR120A relays.
Discussion:
The investigation revealed that the relay's contact-arm retainer was made from Celcon M90 Acetal Copolymer which is a flammable material.
In June 1972, this material was changed to Valox 310-SED, which is self extinguishing and flame resistant. Both materials are white and have the same surface appearance. A G.E. Service Information Letter SIL-NC-229 (a copy of the text is attached for information) indicates that there is no generic overheating problem with this type relay.
However, they recocnend that B'n'R owners replace the contact-arm retainer of all relays (including BOP applications) marked with manufacturers date code between E.D. (May 1968) and A.J. (January 1973) with the improved, self extinguishing flame resistant contact arm retainers.
Action To Be Taken By Licensees And Permit Holders:
Licensees of power reactor facilities with an operating license and construction permit holders shall'take the following actions:
1.
Determine if you hase installed G.E. type CR120A relays in s wherein fires have the Also determine if ment.