ML19295B996

From kanterella
Jump to navigation Jump to search
Submits Requests for Addl Info to Continue Evaluation of 730103 Request to Operate Cycle 9 Core.Util Must Provide Date on Which Requested Info Will Be Submitted within Two Weeks of Receipt of Ltr
ML19295B996
Person / Time
Site: Dresden Constellation icon.png
Issue date: 02/26/1973
From: Ziemann D
US ATOMIC ENERGY COMMISSION (AEC)
To: Brian Lee
COMMONWEALTH EDISON CO.
References
NUDOCS 8010150694
Download: ML19295B996 (1)


Text

.

Distribution 7;. 7 up W.so ci;e t File AEC PDR P2 Reating

.::ht ::c. 50--10 Branch Reading JRBuchanan, CR.':L DJSkovholt, L:0R TJCarter, L: UR Ccanonwealth Edison Company ACRS (16)

ATT!;:

Mr. Byron Lee, Jr.

R0 (3)

Assis tant to the President MKar=an, OGC Post Office Box 767 DLZiemann, L:CRB (22 Chicago, Illinois 60690 RDSilver, L:GRE #2 RMDiggs, L:0RB it2 Gentlenen:

ic continue our evaluation of your January 3, _973, requcct te crercte the cycle 9 cere, the following additional information is required:

1.

Provide the fuel quanty assurance program requested by our letter of Dece=ber 4, 1972.

2.

Provide information to justify the acceptability of using anodized circonium cladding.

Include information to justify that the tech-c.nical performance of the cladding over the fuel rod lifetime is not significantly altered by impurities (e.g., H2 and I;;) picked up by the cladding during anodizing. Also discus: the acceptability of the corrosion resistance of the anodized film f or the anticipated cervice.

If the 28 anodized rods are part of a tcst progran to previde data to justify future inscrtion of a substcntial leading of anodized clad rods, discuss the adequacy of the prcgra= to obtain the necessary data.

he requested information should be submitted with three signed originals and thirty-seven additional copies. Within two weeks of the date cf this letter, provide a date on which the requested infor=ation will be sub-citted.

Sincerely, w e ~. + 't; n-

.;ennis L. Zicnann, Chief Operating Reactors Eranch #2 Directorate of Licensing cc:

John W. Rowe, Esquire Ishar,.incoln & Ecale L GE/C L:0RS =2 i L:CRB P2 1

~ ' '

~ $

y ',,

.Lj QW

_ c( :

n Fa fg'gs DLZitran' 2/22/72 2/22/73 2/N73

/

= = - -

= = = - -.

- = - -

., n ?.

u 8010150[