Advises That Two Specific Event 5 Valve Configurations Do Not Exist at Facility Per Review of Response to NRC . Primary Coolant Sys Pressure Isolation Valves, Technical Evaluation Rept Encl
ML19294C681
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/08/1980
From: Ippolito T
Office of Nuclear Reactor Regulation
To: Berry G
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19294C682 List:
References
NUDOCS 8009170255
Download: ML19294C681 (3)


Text

(c,0#"%,

f,,

UNITED STATES f

y g

NUCLEAR REGULATORY COMMISSION 3

j WASHINGTO N, 0. C. 20555

+#

AUGUST 8 1980

~

Docket No. 50-333 Mr. George T. Berry

. President and Chief Operating Officer Power Authority of the State of New York 10 Columbus Circle New York, New York 10019

Dear Mr. Berry:

By letter dated February 23, 1980, you were requested to provide informa-tion regarding primary coolant system pressure isolation valves.

The objective of this 10 CFR 50.54(f) letter was to identify those plants which have either or both of the valve configurations found in WASH-1400 (Event V) to be significant risk contributors to an intersystem LOCA which results in a core melt accident.

We have confirmed that the two specific Event V valve configurations do not exist at your facility. This is based upon.the evaluation of your response to our February letter as well as the review of previously docketed information (Enclosure).

Based on this, our activities regarding these valve configurations have been finalized for your f aci lity.

In addition to these Event V valve configurations, we are continuing our efforts to review other configurations located at high pressure /

low pressure system boundaries for their potential risk contribution to an intersystem LOCA which may result in a core melt accident.

Therefore, further activity regarding the broader topic of intersystem LOCA's may be expected in the future.

Your time and effort in closing out the Event V portion of the inter-system LOCA concern are appreciated.

Sincerely, 1

Tnomasf. Ippolito, Chief Operating Reactors Branch #2 Division of Licensing Enclosure and ces:

See next page 80091702.55 P

J Mr. George T. Berry

Enclosure:

Franklin Research Center Technical Evaluation Report, " Primary Coolant System Pressure Isolation Valves,"

Dated July 21, 1980 cc w/o enclosure:

Eugene B. Thomas, Jr., Esquire LeBoeuf, Lamb, Leiby & MacRae 1333 New Haapshire Avenue, N. W.

Suite 1100 Washington, D. C.

20036 State University College at Oswego Penfield Library - Documents Oswego, New York 13126

Mr. George T. Berry '

cc:

Mr. Charles M. Pratt Assistant General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. J. Phillip Bayne Senior Vice President -

Nuclear Generation Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. Raymond J. Pasternak Resident Manager James A. FitzPatrick Nuclear Power Plant P. O. Box 41 Lycoming, New York 13093 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 George M. Wilverding Manager-Nuclear Licensing 10 Columbus Circle New York, New York 10019 State University College at Oswego Penfield Library - Documents Oswego, New York 13126