Notifies of Completion of Generic Bounding Review Re Inadvertent Safety Injection During Cooldown.No Further Licensing Action Necessary Since Facility Could Most Likely Withstand More than 50 ECCS Actuations
ML19294C072
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/28/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 8003060639
Download: ML19294C072 (1)


Text

'

6.M opiEER 2 3 A Docket Nes. 50-266 and 50-301 (C ^. D Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Cormany 231 West Michigan Street Milwaukee, Wisconsin 53201

Dear Mr. Burstein:

SUBJECT:

INADVERTENT SAFETY INJECTION DURING CCCLDC'A The Civision of Operating Reactors has completed a generic bounding review on this subject and concludes that no further licensing action is necessary at this tire since it is likely that a facility cculd withstand more than fifty inadvertent ECCS actuations. We have concluded, however, that it would be prudent, shculd a facility experience nore than twenty-five such injections, for ycu to consider a plant specific analysis for that facility which would identify more precisely the additional number of actuations that can be safely accomcdated at that facility.

A copy of our Safety Evaluation Report is enclosed.

Sincerely, 0-ig' 21 sigrad by A. Schwencer, Chief Operating Reactors Branch #1 Division of Operating Reactors

Enclosure:

Safety Evaluation cc: w/ enclosure See next page O-s0 03060 g3

\\

/

.00.R

.(9dh. J.....