ML19294B974

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-518/79-27,50-519/79-27, 50-520/79-27 & 50-521/79-27 on 790924-1124.No Noncompliance Noted
ML19294B974
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 01/04/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19294B975 List:
References
NUDOCS 8003060480
Download: ML19294B974 (2)


See also: IR 05000518/1979027

Text

} t N. [ M.

$a ato

..

.

,

UNITED STATES

  1. s "g

8' A

~

NUCLEAR REGULATORY COMMISSION

n

.E

REGION ll

5

-

,

[

101 MARIETTA ST., N.W., SUITE 3100

$3

\\e,,,s

ATLANTA, GEORGIA 30303

,

SW

In Reply Refer To:

RII:WBS

50-518/79-27

50-519/79-27

50-520/79-27

50-521/79-27

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by W. B. Swan of this office on

September 24 through November 24, 1979 of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for the

Hartsville Nuclear Plant facility, and to the discussion of our findings held

with R. T. Hathcote at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selectiv( examinations of procedures and representative records, interviews with

i

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed

report.

Three new unresolved items resulted from this inspection and are discussed in

the enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

-

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

8003060NQ

-

.

'

-

,

,

Tennessee Valley Authority

-2-

jf,h

4 53;

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C . E . Mu rp hy ,

tief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-518/79-27,

50-519/79-27, 50-520/79-27 and

50-521/79-27

cc w/ encl:

R. T. Hathcote, Project Manager

P. O. Box 2000

Hartsville, TN 37074

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

E. G. Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902

-