Forwards IE Insp Rept 50-267/79-22 on 791201-28 & Notice of Violation
ML19294B927
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/10/1980
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19294B928 List:
References
NUDOCS 8003060416
Download: ML19294B927 (2)


See also: IR 05000267/1979022

Text

k

.

/

/' C

UNITED STATES

[pa at%,%,

NUCLEAR REGULATORY COMMISSION

O&

./%

REGION IV

2 i ~ *' i

i

0

611 RY AN PLAZA DRIVE, SUITE 1000

~^

-

f

AR LINGTON, TEX AS 76012

7

,%. Gl5

2

's *.../

January 10, 1980

,

In Reply Refer To:

Docket No. 50-267/79-22

Public Service Company of Colorado

ATTN: Mr. C. K. Millen

Senior Vice President

F. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. M. W. Dickerson, R. E. Collins and R. Smith of this office during

the period December 1-28, 1979, of activities authorized by NRC Operating

License DPR-34, and to their discussions of the findings with members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in our report, which is

enclosed with this letter.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were not

conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation enclosed herewith as Enclosure (1).

This notice is sent

to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201

requires you to submit to this office, within 20 days of your receipt of

this notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance; and

(3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "RL'.es of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you or your contractors believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information from public disclosure.

8003000

.

Public Service Company of Colorado

-2-

Janua ry 10, 1980

Any such 3pplication must include a full statement of the reasons on the basis

of which it is calimed that the information is proprietary, and should be pre-

pared so that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

$ "l&W

G. L. Madsen, Chief,

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Notice of Violation

2.

IE Inspection Report No. 50-267/79-22

cc w/ enclosures:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado 80651

L. Brey, Quality Assurance

(Same Address)

,