ML19294B903

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-423/79-10 on 791030-1102.No Noncompliance Noted
ML19294B903
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/28/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19294B904 List:
References
NUDOCS 8003060329
Download: ML19294B903 (2)


See also: IR 05000423/1979010

Text

4

6

UNITED STATES

  1. g

o

NUCLEAR REGULATORY COMMISSION

\\

1?

neason n

  • $ p(y ,p(

o_j

sai paan AvrNuc

3

u

e

niNo or caussi A. PENNSYLVANIA 19406

,

g, v */

.....

DEC 2 8 W

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P.O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/79-10

This refers to the inspection conducted by Mr. A. Varela of this office on

October 30-November 2,1979, at Millstone Nuclear Power Station, Unit 3, at

Waterford, Connecticut, of activities authorized by NRC License No. CPPR-ll3 and

to the discussions of our findings held by Mr. Varela with Mr. S. Orefice of

your staff at the conclusion of the inspection, and to subsequent telephone

discussions between Mr. Varela and Mr. Orefice on November 7 and 8, 1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consis+,ed of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprie-

tary, it is necessary that you make a written application within 20 days to this

office to withhold such information from public disclosure.

Any such application

must be accompanied by an affidavit executed by the owner of the information,

which identifies the document or part sought to be withheld, and which contains

a statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

8 0 0 3 0 60 3 2.cf

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

(:x a c. J(/

.-.c

..

.,

,[RobertT.Carlson, Chief

Reactor Construction and Engineering

/j

Support Branch

Enclosuce: Office of Inspection and Enforcement Inspection Report Number

50-423/79-10

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Prvjects

J. F. Opeka, Station Superintendent

J. R. Himelwright, Licensing Safeguards Engineer