Forwards IE Insp Rept 50-423/79-11 on 791121.No Noncompliance Noted
ML19294B778
Person / Time
Site: Millstone Dominion icon.png
Issue date: 12/28/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19294B779 List:
References
NUDOCS 8003050648
Download: ML19294B778 (2)


See also: IR 05000423/1979011

Text

YM

's

a nto ,%

u

UNITED STATES

[ j ')"e r ' ,i

NUCLEAR REGULATORY COMMISSION

3J'

'E

REGION I

0, ;

[

631 PARK AVENUE

% .' .V

,e

KING OF PRUSSIA, PENNSYLVANIA 19406

...

Docket No. 50-423

DE 2 B W

Northeast Nuclear Energy Company

ATTN:

Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 05101

Gentlemen:

Subject:

Inspection No. 50-423/79-11

This refers to the inspection conducted by Mr. A. Cerne of this office on

November 21, 1979, at the NUSCO corporate office at Berlin, Connecticut of

activities authorized by NRC License No. CPPR-113 and to the discussions of our

findings heid by Mr. Cerne with Mr. L. Albee and others of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must be accompanied by an affidavit executed by the owner o? the

information, which identifies the document or part sought to be withheld, and

which contains a statement of reasons which addrestes with specificity the items

which will be considered by the Commission as listed in subparagraph (b) (4) of

Section 2.790.

The information sought to be withheld shall be incorporated as

far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified period, the report will be placed in

the Public Document Room.

8003050 6 N

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, if you should have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

J

'

~

Robert T. Carlson, Chief

(. Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement

Inspection Report No. 50-423/79-11

cc w/ enc 1:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer