BIG ROCK POINT PLANT ANNUAL OPERATING REPORT - OCCUPATIONAL EXPOSLM D
8 003050
- 5 q =3 o
Occupational Personnel Radiation Exposure 1
The following is a list of personnel radiation exposure by job breakdown for the refueling outage and the special F-2 cutage.
The rsdiation exposure accumulated during the entire report period appears at the end of this section and meets the Technical Specification reporting requirement of 6.9.1.b.
These exposures were tabulated frc= pocket dosimeter records, radiation protection logbooks, veekly radiation exposure recori vork sheets and high radiation area work sheets.
The total plant personnel dose is higher than 1978 due to the extended outage period and the nature of work performed.
The two outages account fer 9k.9' of the total pccket dosimeter accu. ulation for 1979 1979 S"--a y - Pocket Dos t=eters
=R en
- Icn-Consumers Power 102776 Plant Staff Personnel Operations 52900 Maintenance 86901 Health Physics h7557 Instrument L Control 162hl Supervisica 23763 Engineering 16269 Quality Control 3S15 CPCo Non-Plant Personnel Quality Assurance h197 Engineering 7479 NDT 557 Maintenance 10lk6h Supervisien 59h Health Fhysics 9319 Mis eellaneous 24 GPEID TOTAL k7kS56 Sub Total Non-CPCo 102776 Plant Staff 2k8hh6 CPCo Non-Plant Staff 12363h h7L856
s SUMMAPY 2.
Big Rock Point Plant Refueling Outage & Replace Core Spray Sparger/Stea Eaffle January 29, 1979 to April 22, 1979 mRet Consumers Power Totals 21h03 Operations 1037h Supervision 5683 Engineering 29320 Maintenance 15625 Health Physics 6568 Instrument & Control Sh6 Quality Control Non-Plant Maintenance 73937 8800 l
Non-Plant Health Physics h230 f
Non-Plant Engineering 2hT8 Quality Assurance i
Total CPCo 17926h Non-Consumers Power nRem
'l NevKirk Allis Chal=ers 3
Hartford Steam Boiler 122 10 Mich. Dept of Health 3artletts Decorator 19 Assoc. Mech. Services 18 I
3 RCA Federal Industrial Services 39 General Electric 5665 l'
Conmenvealth Associates 23 Owens Corning 21579 Trans Eastern Inspection 1015 11268 S'JRI 12176 Exxon h8 NRC Mich. Tractor & Mach. Co.
5 105 Nuclear Services 17 Energy Inc.
Non-CPCC Total 58276
3.
BRP Plant Staff Ecposure versus Specific Work Activity January 29, 1979 to April 22, 1979 Oterations 1 Rem Men Routine 9250 21 Hydro Check, start-up checks L grand tour-215 2
Shutdown Ex Roon Yalving 708 8
RCP Roc =
Valving 1806 1h Pipe Tunnel Valvire 12 L
Steam Dr=
Valving 332 3
CRD Room Valving 17 2
ISI 180 1
Waste Processing 6h7 11 Rx Deck Work 4807 18 Refueling 3h30 1h Total 21h03 Maintenance Rem Men Routine 7672 15 Grand tcur L Hydro Insp.
15 1
RCP Room Valve work, light bulbs 1129 8
CRD Roon Cleaning 28 2
Rx Head Removal 1h15 8
Ex. Head Install 2169 9
Solid Waste Disposal 421 6
Rx Deck Work 27 3
CRD Rocm Incores 3816 10' ISI 808 3
Cobalt Cask h5 2
C.U.
517 1
Stes: Den Valve Work 6233 10 C.U. Demin Pit h61 2
Valves CRD Roos 2022 5
0-Rings Shutdown Ex Room Clean TO 2
Special Maint.
2h58 8
lh 2
Pipe Tunnel Total 29320
3RP Plant Staff Exposure versus Specific Work Activity (Continued) h.
Health Physics mrem Men Routine 2717 7
Monitoring Maintenance ToL9 7
Menitoring ISI h28h 7
Monitoring Special Maint.
951 7
Grand Tour 50 1
Monitoring Waste Disposal 208 2
Monitoring R2 Head-off 165 h
Monitoring Rx Head-On 201 h
Total 15625 Surervision
= Rem Men Routine h203 17 Grand Tour 231 5
Mai-tenance Supv.
2')hh 6
Rx Head 86 1-Refueling 11hh 6
ISI 1035 3
Special Maint 719 6
fiaste Processing 12 1
Total 1037h Instrument & Control mrem Men 955 7
Routine 2hh6 7
Routine Maintenance Shutdown Ex Room h50 5
CRD Room Incores & CRDs 1238 6
RCP Room 1065 5
ISI 55 1
Ex Deck Incores, Neut. Inst.
18 3
C.U. Ex Roca 148 2
Stes: Dru 193 1
Total 6568 Cuality Control nRem Men Routine 39 7 2
Steam Dru 318 2
RCP Roca 55 1
Under Rs Head L9 1
Head Installation 27 1
Total Sh6
CFCo !!on-Plant F.xposure versus Specific 'Jork Activity 5,
-S em Men Maintenance 1980 35 Routine ikT3 5
CRD Room RCP Room Valve Work ik 502 18 Insulation 6009 6
Clean-up 3307 7
Turbine Area 25 2
Shutdown Ex Rocm 2529 11 857 11 Radvaste Ex. Deck 311 7
Steam Den Scaffolding 23061 22 Valve 'Jork 9393 15 Insulation LLS9 lh Total 73937 Eneineering
= Rem Men Routine 912 18 Ex Deck 65 1
Steam Drum 1298 3
RCP Rocs 1938 3
CRD Roc =
17 1
Total h230 NDT mrem Men Routine 3h 3
P.x Deck 526 3
2118 5
RCP Rcom 1026 h
Steam Drm Rx Vessel Flange 692 2
18 1
C.U. Pump Room Shutdevn Ex Room iLO 1
Total 455h
-3 em Men Health Physics 8800 5
Monitoring Total 8800
CPCo !!cn-Plant Exposure versus Specific 'a'ork Activity (Continued) 6.
Cuality Assurance
= Rem Men Routine 903 7
Refueling 38 2
IsI 759 7
Special Maint.
T73 7
Total 21578 e
4 e
NON-CPCo F2posure versus Specific ***ork Acti/ity 7.
NevKirk mrem Men Routine lh77 22 RCP Room L58h 22 Total 6061 Allis Chalmers Routine Total 3
1 Har* ford Stess 3 oiler ISI Total 122 3
Mich. Dett of Health Routine Total 10 1
3artletts Decorator Routine Total 19 2
Associated Mech. Serrices Routine Total 13 1
P.CA Routine Tot al 3
1 Federal Indus. Set-rices Routine Total 30 2
General Electric P2 Deck Total 5665 16 Cctmonwealth Associates Routine Total 23 1
Cvens Corning Routine 730 6
Insulation
?O5LC 6
Total 21579
!!0:T-CPCo Exposure versus Specific 'a'ork Activity (Continued) 8.
Trans Eastern Inspection mrem Men Routine h7 2
ISI 068 2
Total 1015 S*JRI Routine L83 11 ISI 10685 11 Total 11368 Exxon Rx Deck Total 12176 9
ITRC Routine Tot al h8 5
Mich. Tractor & Mach. Co.
Routine Tot al 5
1
' :Tuclear Services Routine 19 1
RCP Room 66 1
Total 105 Enerzy Inc.
Routine Total 17 1
9*
SPECIAL CUTAGE - F-2 DRIVE April 23,1979 to ::cvedber 8,1979 SC033Y Consumers Power Totals mrem Operations 27022 Supervision 101h9 Engineering 9150 Maintenance 52858 Health Physics 26962 Instrument Control 8955 Quality Control 2688 Non-Plant Maintenance 26135 Non-Plant Engineering 3107 Quality Assurance 1529 Non-Plant NDT 517 Health Physics-Ucn-Plant 519 Supervision-Non-Plant 594 Miscellaneous 24 Total CPCo 170219 Mon-Consumers Pcver 2 Rem General Electric 15018 i
D'Appolonia 130 l
NRC 302 Detroit Edison 100 Ccdbustion Engineering, 6176 l
Ex: con 12 l
i Associated Mech. Services 173 Pennington 3rothers 35 Nuclear dervices 78 Argiro 299 NewKirk 2778 Catalytic 3
Chem-Nuclear 9 89 5'4RI 1621 Merrick Engineering 140 Cen=cnvealth Associates 10
SPECIAL CUTAGE - F-2 DRI'/E SG2%RY (Continued) 10, mrem Non-Consumers Pcver (Continued) 20
'Jestinghous e 13L90 Bechtel 55 Energy Inc.
90 Federal Industrial Services 123 Hartford Steam Boiler 1023 Nuclear Tech.
17 Erickson Trucking 10 Burns Security 2
Moog. Engineering Non-CPCo Total h2705
ll, 3RP Plant Staff Expostre versus Specific Work Activity April 23,1979 to ::cvember 8,1979
~3 en Men Oterations 162h9 22 Routine Sh36 16 Ex Deck 2228 12 Refueling Pipe Tunnel Valving L Tagging 17h 3
ho 2
Inspection Steam Drum Valving & Tagging h71 3
7 1
Fydro Inspection Recire Pump Room 8
Valving & Tagging 1637
- 06 2
Inspection 1
3 Painting Shutdevn Ex Rocs Valving & Tagging 52 3
30 3
Inspection CRD Room Valving & Tagging 63 3
226 6
Hydro C.U. Ex Boom Valving & Tagging 38 2
Rx. Pump Room 8
1 Valving Clean-Up Demin Pit 18 1
Valving 2
1 ISI 20 3
Solid Waste Disposal lh 1
Liquid Waste Disposal Total 27022
= Rem Men Surervision h905 17 Routine 902 9
CRD Room lho 1
l CRD Access 6
229 l
Steam Drum 1062 9
i RCP Room j
RxDeck 1
13 i
Diffusers 17 1
Mushroom 1650 6
Misc.
738 5
Refueling 2
13 C.U. Rx Rec =
Shutdcun Ex Room 9
3 20 3
C.U. Pit 3
Pipe Tunnel 151 ISI 10 1
Fuel Fool 263 2
Valves 1
27 Inspect Head Total 101h9
3RP Plant Staff F2posure versus Specific Work Activity (Continued) 12.
mrem l'en Enrineering 5706 16 Routine CRD Room 28 2
Sound Analysis 88 2
Hydro 1530 9
Inspection ISI CRD Roca (Pictures) h7 1-h0 1
Tarl Room Chem Tank 33 1
26 1
Rx Deck 130 3
Steam Dru:
356 h
RCP Room 22 1
C.U. F2 Roc =
PJ Deck Eaffle Plates 11hh h
Total 9150 mrem Men Maintenance 16h51 17 Routine Waste Process Solid Waste Disposal 92 5
Valve Repair & Packing 10260 8
Drain Work lh5 3
769 1
Hangers 19h6 3
Pump Seal Special Maintenance RCP Room Scaffolding 509 3
278 5
"'he:nal Sleeve 523 3
1232 8
Replace Modules 8
Remove L Install Incores 1593 48 1
Repair Hoist Switch 1196 6
Rod Work 18 1
Inspection Install Scaffolding 21 1
Install Blank Flange 37 2
k 210 Clean-Up h099 6
0-Riras 40 1
Install Insulation Steam Drum 10 2
Install Pop Gass Valve Work 2993 6
k03 5
Recycle Line Work Yarways 1h1 2
Rx Deck Remove Thermal Insulation 10 1
623 h
F2 Seal Remove Head 787 5
Surveillance Coupon hh38 3
Install Fuel Fool Filter Cover LO 1
t l
BRP Plant Staff Exposure versus Specific Ucrk Activity (Continued) 13.
l Maintenance (Continued) mrem Men Rx. Deck (Continued) f Baffle Plate L Diffuser 660 5
Clean-Up 16 2
Vent Line 19 7 2
Head Insulation 2917 9
Clean-Up Pit 35 1
Pipe Tunnel 76 2
Total 52858 Health Ph:rsies nRem Men Routine 90kk 9
RCP Rocs 6112 9
CRD Access 166 3
CRD Room 65k1 9
Stee.m Drc.m 1860 6
Pipe Tunnel kk k
Ex. Deck 1261 9
Old Fuel Sock Roca 100 1
Tank Room ko8 3
Fuel Fool Filter Area 22 1
Chemical Tank 23 1
Special Maintenance 230 1
Shutdown Ex. Room 166 6
Solid Waste Disposal 5h 2
Fuel Fool 83 3
C.U. Demin Pit 119 h
l C.U. Ex. Room 266 h
Seismic Studies h63 2
Total 26962 Instrxlent & Control mrem Men Routine 5007
.7 CRD Ecom 2879 7
Rx. Deck 70 2
Steam Drum 168 2
RCP Room 770 2
Shutdown Ex Room 61 2
Total 8955 Cualit:r Control nRem Men Routine 18k5 3
CRD Room 319 2
RCP Room k82 2
P2. Deck h2 1
Total 2688
lk, CPCo Non-Plant Exposure versus Specific 'Jork Activity mrem
!'en Maintenance 31L8 22 Routine CRD Roon 1
Remove Modules 105 576 2
2910 0-Rings 6
911 Insulation 220 3
Incores Steam Drta 6
77C9 Scaffolding BCP Room 2
Scaffolding 999 2170 7
Hangers h
1272 Valve Work C.U. Ex Ro:=
168 2
Hangers Stal 26135 mrem Men Engineerin 915 30 Routine C?D Roca 6L6 lk Scund Analysis RC? Rocm 607 lh Sound Analysis h0 Tank Roca h
798 ISI 2
70 Steam Drum 1
72 C.U. Ex Room Total 3107 mrem Men Cuality Assurance 1529 11 Routine Total 1529 mRen Men
- Ton-Destructite Testing 1k0 5
Routine 387 5
ISI Total 527
= Rem Men Health Physics _
82 2
3outine L37 1
RCP Rocm Total 519
CPCo Ilon-Plant Exposure versus Speci:'ic "!:rk Activity (Continued) 15 Sutervision nRen Men Routine h5 2
RCP Rocs h77 1
Total 59h Other (Miscellaneous)
Routine 2h 1
f I
i l
i e
I i
i O
t
..*e
...m
10.
- 10:7-CPCo F.xposure versus Specific Work Activity General Electrie mrem
?!en Routine 3
1 CRD Room 382 h
Rx Deck lh633 2h Total 15018 D'Arnolonia Steam Drt:m Total 130 2
?IRC Routine 29 3
Steam Drum 15 1
CF3 Room 208 2
RCP Rocs 50 1
Total 302 Detroit Edison Routine Total 100 2
. Combustion F.ngineering Routine 172 6
600h 6
CRD Rocs Total 6176 Eccon 1
Routine Total 12 Associated Mech. Services 26 5
Routine CRD Rocs 20 2
RX Deck 21 2
106 3
RCP Roc =
Total 173 Pennington Brothers Routine 5
1 ISI 30 1
Total 35
NON-CPCo Z:gosure versus Specific Work Activity (Continued) 17 i
Nuclear Services
.R em Men Routine 38 3
RX Deck 10 2
CPS Room 30 2
Total 78 I
Argiro 17h 1
Routine CRD Rocm 125 1
Total 299 NevKirk Routine 189h 18 l
RCP Room 88h 8
Total 2778 1
Catal:rtie Routine Total 3
1 j
9 Chem-Nuclesr I
Solid Waste Total 9 69 3
l l
I C.U. F2 Room 130 1
I Total 1621
.t Merrick Engineering Routine Total lho 2
i Cor.cnvealth Assceiates Routine Total 10 1
Westinghouse Routine Total 20 2
- CII-CPCo Exposure versus Specific 'Jork Actitity (Continued) 13, rRen Men Bechtel Routine 533 12 6160 8
Steam Dr.:n C.U. Desin 19 3
C.U. Ex Rocs 339 3
CRD Room 171 3
RCP Room 5810 7
Shutdcwn Hx Rocc 288 5
176 2
Tank Recs Total 13L96 Enerer Inc.
raem Men Routine 12 3
h3 3
Stee Drum Total
$5 Federal Industrial Serrices Turbine Area Total 40 1
Hartford Steen Boiler Routine 10 2
ISI 96 1
Total 123 Nuclear Tech.
Routine 21 3
ISI 1007 3
Total 1026 Erickson Truckinz Routine Total 17 2
Burnc Securit:r Routine Tota'
'O 1
'4cce Eneineerina Routine Total 2
1
I NUMBER OF PERSONNEL AND FiAN-RDt BY WORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Refueling Outage & Corespray Sparger Replacement-January 29 to April 22, 1979 Number of Personnel ( 100 mrem)
Total mrem ntract i
Work and Job Function Station Utility Station Utility rs &
- "#8 Empl.
Empl.
Empl.
Empl.
Others Others REACTOR OPERATIONS & SURVEILLANCE Maintenance Personnel
, 35 7,980 21 12,3ho
,0perating Personnel llcalth Physics Personnel 7
2,767 Superviscry Personnel 17 h,13h 6
13 18 2,847 912 Engineering Personnel Instrument & Control Personnci 7
955 Clerical Personnci QA & QC 2
7 397 908 UDT Personnel 3
3h All Other Personnel 58 2,941 ROUTINE MAINTENANCE Maintenance Personnel 18 35 25,633 65,100 Operating Personnel j IIcalth Physics Personnel 7
la i Supervisory Personnel 17 3,030 Engineering Personnel 13 h00 Instrument & Control Personnel 7
2 5,556 Clerical Personnci 2
7 132 QA & QC Personnel NDT Personnel 32 13,894
NUMBER OF PERSONNEL AND MAN-RDI BY WORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GE!!ERATING PLANT 1979 Refueling Outu6e & Corespray Sparger Heplacement-January 29 to April 22,19'(9 Number of Personnel ( 100 mrem)
Total mrem n ract Work and Job Function Station Utility Station Utility crs 6
- #8 Empl.
Empl.
Empi.
Empl.
Others Others IllSr.P'!TCP IN9PFCTTor!
808 18 Maintenance Personnel 180 21 Operating Personnel 7
b Health Physics Personnel 1,035 Supervisory Personnel 17 13 18 2,233 3,31 8 Engineering Personnel 55 Instrument 6 Control Personnel 7
Clerical Personnel 2
7 317 759 QA 6 QC NDT Personnel 9
h,520 32 23,122 All Other Personnel SPECIAL HAltlTENANCE 18 2,458 Maintenance Personnel Operating Personnel Itcalth Physics Personnel 17 719
- Supervisory Personnel 13 173 Engineering Personnel Instrument & Control Personnel l Clerical Personnel 773 7
QA & QC Personnel UDT Personnel 1h 6,620
NUMBER OF PERSONNEL AND M1N-REM BY UORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Herueling Outage & Corespray Sparder Heplacement-January 29 to April 22, 1979 Number of Personnel ( 100 mrem)
Total mrem
" #"C Work and Job Function Station Utility Station Utility r ers &
empl.
Empl.
Empl.
Empl.
Others Others WASTE PROCESSING 421 857 Maintenance Personnel 18
,.11 21 652 Operating Personnel IIcalth Physics Personnel 12 Supervisory Personnel 17 Engineering Personnel Instrument & Control Personnel Clerical Personnel QA 5 QC NDT Personnel All Other Personnel REFUELING Maintenance Personnel 21 8,231 Operating Personnel llIcalth Physics Personnel l lhh 17 i
, Supervisory Personnel 30 13
- Engineering Personnel 2
Instrument 6 Control Personnel 7
Clerical Personnel 38 2
QA 6 QC Personnel NDT Personnel 11 699 12 7
NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Refueling Outage & Corespray Spurger Replacement January 29 to April 22, 1979 Number of Personnel ( 100 mrem)
Total mrem Work and Job Function Station Utility Station Utility 8
r rs &
Emp1.
Empi.
Empl.
Empl.
Others Others MOMITORING Maintenance Personnel Operating Personnel llcalth Physics Personnel 7
5 12,858 8,800 Supervisory Personnel Engineering Personnel Instrument & Control Personnel Clerical Personnel QA & QC HDT Personnel All Other Personnel TOTAL EXPOSURE Maintenance Personnel 18 35 29,320 73,937 Operating Personnel 21 21,403 1 llealth Physics Personnel 7
5 15,625 8,600 Supervisory Persennel 17 10,374 Engineering Personnel 13 18 5,683 h,230 Instrument &' Control Personnel 7
2 6,$68 Clerical Personnel QA & QC Personnel 2
7 8h 6 "
2,h78 f
NDT Personnel 9
h,554 86 58,276 All Other Personnel
NUMBER OF PERSONNEL AND MAN-REM BY UORK AND JOB FUNCTION AT T11E BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Specini Outuge-F-2 Drive-April 23 - November 8 Number of Personnel ( 100 mrem)
Total mrem n ract Station Utility Work aid Job Function Station Utility r rs &
Empl.
Empl.
Others Empl.
Empl.
Others (EACTOR OPERATIONS & SURVEILLANCE faintenance Personnci 22 19,792 Operating Personnel ilcalth Physics Personnel 9
h 26,406 519 Supervisory Personnel 17 2
8,548 h5 8,853 2,257 16 30 Engineering Personnel h,Vlh 7
Instrument & Control Personnel Clerical Personnci 3
11 2,309 1,529 QA & QC 340 NDT Personnel 5
1 72 2h 3,231 All Other Personnel ROUTINE MAINTENANCE 17 22 37 52,257 26,13S 2,778 Maintcaance Personnel Operating Personnel llcalth Physics Personnel Supervisory Personnel Engineering Personnel h,2h1 Instrument & Control Personnel 7
Clerical Personnel QA & QC Personnel NDT Personnel
NUMBF.R OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Special Outage-F-2 Drive-April 23 to November 8,1979 Number of Personnel (
100 mrem)
Total mrem Contract Work and Job Function Station Utility Station Utility W
ers &
Empl.
Empl.
r.mpl.
Empl.
Others Others TilSI'I"/TCE INSPECTTnt!
Maintenance Personnel 2
1 Operating Personnel 3
272
!!calth Physics Personnel Supervisory Personnel
.1 2
273 5149 h
16 29 7 798 Engineering Personnel Instrument & Control Personnel Clerieni Personnel 1+06 QA 5 QC 3
387 NDT Personnel 5
All Other Personnel 38 8.1.62 SPECIAL MAINTENANCE 509 Maiutenance Personnel 3
Operating Personnel 230 1
Health Physics Personnel St.pervisory Personnel 52 1
Engineering Personnel Instruraene & Control Personnel Clerical Personnel I QA 6 QC Personnel NDT Personnal 69 27,245 411 nrwar en connel
IRIMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION AT Tile BIG ROCK POINT NUCLEAR GENERATING PLANT 1979 Special Outade-F-2 Drive-April 23 to November 8,1979 Number of Personnel
(
100 mrem)
Total mrem
,[
Uork and Job Function Station Utility Station Utility res&
Empl.
Empl.
Empl.
Empl.
Others Others WASTE PROCESSING laintenance Personnel 5
92 i
2 33 3perating Personnel 5h 2
llealth Physics Personnel Supervisory Personnel Engineering Personnel Instrument & Control Personnel Clerical Personnel QA & QC NUT Personnel 9 89 2
all Other Personnel REFUELING Maintenance Personnel 19 7,195 Operating Personnel Ilcalth Physics Personnel 6
1,328 Supervisory Personnel Engineering Personnel Instrument & Control Personnel Clerical Personnel QA & QC Personnel NDT Personnel
NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB FUNCTION AT Tile B1G ROCK POINT NUCLEAR GENERATING PLANT 1979 Special Outage-F-2 Drive - April 23 to November 8,1979 Number of Personnel ( 100 mrem)
Total mrem n ract Work and Job Function 3tation Utility Station Utility rs &
s&
l:mpi.
Empi.
Emp1.
Empl.
Others Others
!!ONITORING Maintenance Personnel Operating Personnel llcalth Physics Personnel 9
4 26,962 519 Supervisory Personnel Engineering Personnel Instrument & Control Personnel Clerical. Personnet QA & QC NDT Personnel All Other Personnel TOTAL EXPOSURE Maintenance Personnel 17 22 37 52,858 26,135 2,778 22 0
27,022 Operating Personnel Ilealth Physics Personnel 9
h 26,962 519 Supervisory Personnel l '(
2 10,169 591 1
Engineering Personnel 16 3o 9,150 3,107 Instrument & Control Personnel 7
0 8,955 Clerical Personnel 0
11 2,688 1,529 NDT Personnel 5
527 s
All Other Personnn1 1