Forwards IE Insp Rept 50-327/80-01 on 800109-11.No Noncompliance Noted
ML19294B692
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/15/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19294B693 List:
References
NUDOCS 8003050327
Download: ML19294B692 (2)


See also: IR 05000327/1980001

Text

Wd

4

MA p. n. y ., . .. - . . . r , ,, . ., ..,g

4^ , p7

,i.

s-

/snato

m

.gsggyW_p.

2

' /

o

UNITED STATES

,

,,

g

$g

e

NUCLEAR REGULATORY COMMISSION

o

~S

REGION il

i

o,

/

101 MARIETTA sT.. N.W., SUITE 3100

P

o

ATLANTA, GEORGIA 303o3

FEB 15 WBO

In Reply Refer To:

RII:AT

50-327/80-1

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

CLattanooga, TN 37401

Gentlemen:

.

This refers to the inspection conducted be A. T llman of this office on

January 9-11, 1980, of activities authori d by NRC Constructicn Permit No.

CPPR-72 at Sequoyah Nuclear Plant and to the discussions of our findings held

with W. F. Popp at the conclusion of the inspection.

Areas examined during this inspection included your physical security program as

implemented under the provisions of Title 10, Code of Federal Regulations,

Part 73, " Physical Protection of Plants and Materials" and the specific require-

ments of your approved Security Plan. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, interviews

with personnel, performance tests, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, activities involving safeguards and

security measures are exempt from public disclosure; therefore, the enclosed

inspection report with the exception of the report cover page, which is an

inspection summary, will not be placed in the Public Document Room.

Should you have any quest.'ons concerning this letter, we will be glad to discuss

them with you.

Since ely,

- .

A

'-

.

W. B. Ke ia , Chief

Safeguards Branch

Enclosures:

1.

Inspection Report No. 50-327/80-1

(Exempt from Disclosure)

2.

Inspection Summary

(Not Exempt)

cc:

(See Page 2)

g00305 03N

~t' ATE!M;T***"?!FMcr"'IH

-tf:TW s2.i3 .:. : M L -

.ll4"""' ""C ;

.s , . i !I-

.-Et hi E U .:

L

J

Tennessee Valley Authority

-2-

gggO

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

D. L. Lambert, Project Engineer

'

400 Chestnut Street Tower II

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, Tennessee 37381

G. Beasley

c. .

Tennessee Valley Authority

309 Grant's Building

Knoxville, Tennessee 37902