ML19294B613

From kanterella
Jump to navigation Jump to search
Summary of 800207 Meeting W/Util at Site Re Review of OL Application W/Discussion of Confirmatory Piping Analysis
ML19294B613
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/19/1980
From: Kintner L
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8003050151
Download: ML19294B613 (2)


Text

TEAM MEETING

SUMMARY

DISTRIBUTION LWR-1 Docket File

  • NRC Participants NRC PDR PR J '329 Appropriate IE Regional Offices Local PDR M. D. Hunt - Region II TIC D. L. Meyer NRR Reading A. S. Fine LWR 1 File R. Stephens H. Denton E. G. Case H. Berkow D. Ross D. Vassallo J. Stolz R. Baer Caseload Forecast Panel Meetings Only O. Parr L. Rubenstein J. Rothfleisch S. Varga T. Abell C. Heltemes G. Matthews L. Crocker W. Lovelace B. Kirschner S. Boyd F. Williams H. Berkow R. Mattson L. Schaub R. DeYoung Trip Participants Project Manager Attorney, ELD E. Hylton IE (3)

ACRS (16)

R. Denise t

800805'e

pn ata uq'%

UNITED STATES

+

S Y)c.,[f.[h NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 g.?fD ?f E

o. '4...../

FEE 9:350 Docket No: 50-364 APPLICANT: Alabama Power Company FACILITY:

Joseph M. Farley Nuclear Plant Unit 2

SUBJECT:

SUMMARY

OF FEBRUARY 7, 1980 MEETING REGARDING REVIEW 0F OPERA-TING LICENSE APPLICATION The staff met with the applicant at the Farley Nuclear Plant to view Farley Unit 2 piping systems and to discuss its confirmatory piping analysis as a part of the review of the operating license application.

In addition, Mr. David Meyer and Mr. Alan Fine viewed the control room and other safety significant parts of the plant as a part of their training. is a list of attendees. is a summary of the part of the visit concerning the confimatory piping analysis.

n a

Q-L. L. Kintner, Project Manager Light Water Reactors Branch No. 1 Division of Project Management

Enclosures:

As Stated cc:

See next page

I ENCLOSURE 1 FEBRUARY 7, 1980 MEETING WITH ALABAMA POWER CO. - NRC ATTENDEES LIST NAME ORGANIZATION David L. Meyer NRC Alan S. Fine NRC Cathleen A. Williams PNL Gordon Beeman PNL James M. Alzheimer PNL McBampton PNL Randy Stephens NRC Lester Kintner NRC Tom Milton SCS

8. J. George SCS J. R. Crane SCS D. E. Kendrick SCS W. C. Ramsey SCS R. R. Ganti Bechtel C. L. Buck APCo.

J. G. Hegi APCo.

M. D. Hunt NRC - Region II

I ENCLOSURE 2 on ano A

f, 8

i UNITED STATES NUCLEAR REGULATORY COMMISSION

-t

\\...../

WASHINGTON, D. C. 20555 FEB 121980 Docket No. 50-364 APPLICANTS:

8.labama Power Company FACILITY:

Far?ey 2

SUBJECT:

SUMMARY

OF FEBRUARY 7,1980, SITE VISIT 1

On Februar Services, y 7,1980, we met with representatives of Alabama Power

\\

and Bechtel at the Farley 2 site.

i was to view various piping systems throughout the plant and to chThe for our confirmatory analysis.

Northwest Laboratory.

This analysis will be performed by Pacific oose one Upon completion of the plant tour, we informed the applic chosen the "A" Main Steam Line from the steam generator nozzle ant that we had containment penetration.

We discussed the methods which Bechtel had used i o the the SSE.

analyzing the main steam line.

to include the steam generator in our model and would likWe i wish.

further discussions with Westinghouse.

e to have mation which the applicant should submit so that we might analy line.

The meeting was adjourned.

e the A list of attendees is attached.

A Randal M. Stephens Mechanical Engineering Branch

Enclosure:

Division of Systems Safety As stated cc:

H. Denton R. Mattson F. Schauer J. Stolz K. Kniel R. Baer T. F vak O. Parr Z. hasztoczy L. Rubenstein R. Satterfield S. Varga W. Butler L. Kintner F. Rosa J. P. Knight V. Moore R. Tedesco R. Denise S. Pawlicki V. Benaroya R. Jackson M. Bampton, PNL c,

bt:g& ;:a W i

Mr. F. L. Clayton, Jr.

FEB fg;ggg Mr. F. L. Clayton, Jr., Senior Vice President' Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 cc: Mr. Alan R. Barton Executive Vice President Alabama Power Company Post Office Box 2641 Birmingham, Alabama 35291 Mr. Ruble A. Thomas Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Mr. George F. Trowbridge Shaw, Pittman, Potts and Trowbridge 1800 f1 Street, N. W.

Washington, D. C.

20036 1

kh

,