ML19294B524

From kanterella
Jump to navigation Jump to search
Forwards LER 80-010/01T-0
Date released: 11/04/2019 Download: ML19294B524


LER 80-010/01T-0:on 800214,reanalysis of RCS Pipe Restraints Per IE Insp Rept 50-346/79-23 Revealed Design Deficiency on Two Reactor Coolant Hot Leg Pipe Whip Restraints at Top of Each RCS Hot Leg.Caused by Design Error
ML19294B526
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/26/1980
From: Mekbel C
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19294B526 (4)
Forwards LER 80-010/01T-0
ML19294B523
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/26/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19294B523 (1)