U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION IV Report No. 99900349/79-02 Program No. 51300 Company:
Corner and Lada Company, Inc.
1341 Elmwood Avenue Cranston, Rhode Island 02910 Inspection conc cted:
November 13-16, 1979 1- [C
/d 7 f
- l Inspectors:
s L.'E. Ellershaw, Contractor Inspector 4)at/c ComponentsSection II Vendor Inspection Branch Approved by:
h[j z,u.dadt! -
/M/O/7 7 D. M. Hunnicutt, Chief
/ Dat6 ComponentsSection II Vendor Inspection Branch Summary Inspection conducted November 13-16, 1979 (99900349/79-02)
Areas Inspected:
Implementation of 10 CFR 50 Appendix B criteria, and applicable codes and standards including: previous inspection findings; internal audits; nonconformances and corrective action; manufacturing process control; procedure, document and drawing control; qualification of personnel performing special processes (NDE); equipment calibration, and welder qualifications.
The inspection involved twenty-five (25) inspector hours on site.
Results:
In the eight (8) areas inspected, seven (7) deviations from commitments were identified. No unresolved items were identified.
Deviations:
Internal Audits - audits not performed on a monthly basis nor has the program been audited within a twelve (12) month period (Notice of Deviation, Item A); Nonconformances and Corrective Action - nonconforming material reports show no evidence of being reviewed by the Authorized Nuclear Inspector (Notice of Deviation, Item B); Manufacturing Process Control -
activities operators not signing operations off on travelers, inspection hold points were by-passed, and parts are stamped in wrong location (Notice B0022 80 l[.6 L
2 of Deviation, Item C.I. and C.2.); Procedure, Document and Drawing Control -
drawing requires marking in a location which cannot be accomplished because of the size of the part (Notice of Deviation, Item D.I. and D.2.); Drawings have incorrect code marking symbols for the material specifications (Notice of Deviation, Item E); Many drawings show no evidence of review by engineering and quality assurance (Notice of Devation, Item F); Qualification of Personnel Performing Special Processes (NDE) - two (2) persons have been certified as being qualified Level II examiners without being given a vision test (Notice of Deviation, Item G).
3 DETAILS SECTION (Prepared by L. E. E11ershaw)
A.
Persons Contacted W. T. Allen, Manager, Quality Assurance C. P. Hou, Manager, Technical Services J. Kerrigan, Quality Control Inspector P. Lee, Material Handling Foreman L. J. Pires, Quality Control Inspector A. V. Rogers, Plant Manager B.
Action on Previous Inspection Findings 1.
(*Losed) Deviation No. A (Report No. 79-01):
This item dealt with the placement of purchase orders with vendors who were neither on the Approved Vendor List nor AShE certificate holders.
Corner and Lada Co., Inc., (C&L) has implemented their committed corrective actions, in that all vendors have been either surveyed and placed on the Approved Vendors List or they are ASME certificate holders.
2.
(Closed) Deviation No. B (Report No. 79-01):
This item dealt with activity operators not signing off their respective operations on the travelers, and QA inspection hold points being by passed.
C&L implemented their committed corrective action for the specific violations cited; however, their actions to prevent recurrence appear to be inadequate as indicated by a similar deviation identified during this inspection.
(See Notice of Deviation, Item C).
3.
(Closed) Devation No. C (Report No. 79-01): This item dealt. with the failure of welders to perform within the parameters of the non-essential variables of a weld procedure specification.
C&L has implemented their committed correc~ive action in that training sessions were held for all welders, and observation of in process welding operations revealed that all variables were being complied with.
4.
(Closed) Unresolved Item (Report No. 79-01): This item dealt with the failure of department managers (except Engineering) to develop a written program for indoctrination and training.
4 C&L has implemented their committed corrective action in that all departments now have a written program addressing indoctrination and training.
C.
Internal Audits 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for conducting and reporting internal audits in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objective was accomplished by:
a.
Review of QA Manual Section QN-12.0, " Audits," revision 0 dated April 27, 1977.
b.
Review of internal audit schedule and checklists.
c.
Review of documentation to assure follow-up audits were conducted where necessary.
d.
Discussion with cognizant personnel.
3.
Findings a.
Deviation From Commitments See Notice of Deviation, Item A.
b.
Unresolved Item None D.
Nonconformances and Corrective Action 1.
Objective The objective of this area of the incpection was to verify that C&L had implemented the requirements for the control of non-conformances and corrective action in accordance with the QA Manual and applicable NRC and ASME Code requirements.
I s
5 2.
Method of Accomplishment The preceding objectiva was accomplished by:
a.
Review of QA Manual Section QN-10.0, "Nonconformities,"
revision 0, dated April 27, 1977.
b.
Review of open and closed nonconforming material reports.
c.
Review of open and closed corrective action requests.
d.
Observation of nonconforming material to assure that it was identified as being nonconforming.
e.
Discussion with cognizant personnel.
3.
Findings a.
Deviation From Commitments See Notice of Deviation, Item B.
b.
Unresolved Item None.
E.
Manufacturing Process Control 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for the control of manufacturing processes in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objective was accomplished by:
Review of QA Manual Section QN-4.0, " Process Control,"
a.
revision 0, dated April 27, 1977.
b.
Review of Shop order packages and abservation of in process manufacturing operations.
c.
Discussions with cognizant personnel.
J 6
3.
Findings a.
Deviation From Commitments See Notice of Deviation, Item C.
b.
Unresolved Item None.
F.
Procedure, Document and Drawing Control 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for the control of procedures, documents and drawings in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objective was accomplished by:
a.
Review of QA Manual Section QN-1.4, " Instructions - Procedures,"
revision 0, dated April 27, 1977.
b.
Review of Specifications ST-150 and ST-251, both revision 0 and dated September 19, 1977 and August 2, 1976, respectively.
c.
Review of drawings and their associated Product Design Check lists.
d.
Discussion with cognizant personnel.
3.
Findings a.
Deviation From Commitment (1) See Notice of Deviation, Items D.1 and 2.
(2) See Noti e of Deviation, Item E.
(3) See Notice of Deviation, Item F.
The following observations were made relative to the drawings referred to in Item F.
2
~
7 (a) Drawing B3510, Figure N100: revision 0 dated November 16, 1978 - The Product Design Check List (PDCL) was not used and QA did not sign the drawing; revision 1 dated November 17, 1978 - QA did not sign the PDCL or the drawing, and there was no checker or engineering approval; revision 2 dated August 15, 1979 - the PDCL was not used.
(b) Drawing B3511, Figure N101: same as (a) above.
(c) Drawing B3512, Figure N102:
revision 0 dated November 6, 1978 and revision 1 dated November 17, 1978 - same as (a) above; revision 2 dated May 22, 1979 - The PDCL was not used, and there was no checker, engineering or QA approval on the drawing; revision 3 dated August 15, 1979 - there was no PDCL and no checker or QA approval on the drawing.
(d) Drawing B3513, Figure N103: same as (a) above.
(e) Drawing A3489, Figures N305 and N306: revision 0 dated January 24, 1979 - The PDCL was not used and there was no QA approval on the drawings.
(f) Drawing B3519, Figures N400 and N401: Same as (e) above.
(g) Drawing A3417, Figure N409: revision O dated December 18, 1978 - The PDCL was not used and there was no QA approval on the drawing; revision 1 dated September 4, 1979 - the PDCL was used however, there was no checker, engineering, or QA approval on the drawing.
b.
Unresolved Item No r.e.
G.
Qualification of Personnel Performing Special Processes - NDE 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for qualifying nondestructive examination personnel in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method.if Acccmplishment The preceding objective was accomplished by:
3 8
Review of QA Manual Section QN-6.0, " Nondestructive Examination,"
a.
revision 0, dated April 27, 1977.
b.
Review of personnel qualification records.
c.
Discussion with cognizant personnel.
3.
Findings a.
Deviation From Commi'. ment See Notice of Deviation, Item G.
Unresolved Item None.
II.
Equipment Calibration 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for the control of equipment calibration in accordance with the QA Manual and applicable NRC and ASME Code requiraments.
2.
Method of Accomplishment The preceding objective was accomplished by:
Review of QA Manual Section QN 7.0, " Calibration of Measuring a.
and Test Equipment," revision 0, dated April 27, 1977.
b.
Review calibration status and records of welding power sources, ring and plug gages.
c.
Review of Specification ST-640, " Gage and Instrument Calibration," revision 0, dated April 14, 1977.
d.
Review status and records of the tong tester and voltmeter e.
Discussion with cognizant personnel.
3.
Findings a.
Deviation From Commitments None.
~
9 b.
Unresolved Item None.
I.
Welder Qualifications 1.
Objective The objective of this area of the inspection was to verify that C&L had implemented the requirements for the qualification of welders in accordance with the QA Manual and applicable NRC and ASME Code requirements.
2.
Method of Accomplishment The preceding objective was accomplished by:
Review of QA Manual Section QN-5.0, " Welding," revision 0, a.
dated April 27, 1977.
b.
Review of Welder Qualification Forms, QW-484, of five (5) welders with comparison against the requirements of ASME Section IX.
c.
Discussions with cognizant personnel.
3.
Findings a.
Deviation From Commitment None.
b.
Unresolved Item None.
J.
Exit Interview A meeting was held at the conclusion of this inspection on November 16, 1979, with the following management representatives:
W. T. Allen, III, Manager, Quality Assurance E. W. Corner, President J. W. Fenny, Manager, Engineering C. P. Hou, Manager, Technical Services W. Lada, Vice President A. W. Rogers, Plant Manager
10 The scope and findings of this inspection were summarized.
Management acknowledged the statements relative to the findings.