Forwards IE Insp Rept 50-346/78-29 on 781025-29,1101-03, 1115-17,1129-30 & 1211 & Notice of Violation
ML19294A641
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/25/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Grant
TOLEDO EDISON CO.
Shared Package
ML19294A642 List:
References
NUDOCS 7903080057
Download: ML19294A641 (2)


See also: IR 05000346/1978029

Text

r-

,-

,.

  1. " ""' %

UNITED STATES

{

NUCLEAR RFGULATORY COMMISSION

  • -

4

.

f ,,(f

. }

i

REGION lif

p f

799 ROOSEV E LT ROAD

,

k, h,M [

GLEN ELLYN, ILL6NOis 60137

  • ....

JAli 2 L arg

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. James S. Grant

Vice President - Energy

Supply

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Messrs. T. N. Tambling

and M. D. Riden of this office on October 25-29, November 1-3,

15-17, 29-30 and December 1, 1978, of activities at Davis-Besse

Nuclear Power Station, Unit 1, authorized by NRC Operating License

No. NPF-3 and to the discussion of our findings with Mr. T. Murray

and other m;mbers of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

During this inspection, certain of your activities appet. ed

to be in noncompliance with NRC requirements, as described

in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code

of Federal Regulations. Section 2.201 requires you to submit to

this office within twenty days of your receipt of this notice a

written statement or explanation in reply, including for each

item of noncompliance: (1) corrective action taken and the results

achieved; (2) corrective action to be taken to avoid further non-

compliance; and (3) the date when full compliance will be achieved.

790308 005 7

,

.

J/iN 2 L 379

Toledo Edison Company

-2_

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this

letter, the enclosures, and your response to this letter will be

placed in the NRC's Public Document Room, except as follows.

If

the enclosures contain information that you or your contractors

believe to be proprietary, you must apply in writing to this of fice,

within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a

full statement of the reasons for which the information is considered

proprietary, and should be prepared so that proprietary information

identified in the application is contained in an enclosure to the

application.

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

V

['&

A

.

Gaston Fiorelli, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection keport

No. 50-346/78-29

cc w/encls:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

/ TIC

U. Young Park, Power

Siting Commission