ML19294A641
| ML19294A641 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/25/1979 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Grant TOLEDO EDISON CO. |
| Shared Package | |
| ML19294A642 | List: |
| References | |
| NUDOCS 7903080057 | |
| Download: ML19294A641 (2) | |
See also: IR 05000346/1978029
Text
r-
,-
,.
- " ""' %
UNITED STATES
{
NUCLEAR RFGULATORY COMMISSION
- -
4
.
f ,,(f
. }
i
REGION lif
p f
799 ROOSEV E LT ROAD
,
k, h,M [
GLEN ELLYN, ILL6NOis 60137
- ....
JAli 2 L arg
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. James S. Grant
Vice President - Energy
Supply
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the inspection conducted by Messrs. T. N. Tambling
and M. D. Riden of this office on October 25-29, November 1-3,
15-17, 29-30 and December 1, 1978, of activities at Davis-Besse
Nuclear Power Station, Unit 1, authorized by NRC Operating License
No. NPF-3 and to the discussion of our findings with Mr. T. Murray
and other m;mbers of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas
examined during the inspection. Within these areas, the
inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with
personnel.
During this inspection, certain of your activities appet. ed
to be in noncompliance with NRC requirements, as described
in the enclosed Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code
of Federal Regulations. Section 2.201 requires you to submit to
this office within twenty days of your receipt of this notice a
written statement or explanation in reply, including for each
item of noncompliance: (1) corrective action taken and the results
achieved; (2) corrective action to be taken to avoid further non-
compliance; and (3) the date when full compliance will be achieved.
790308 005 7
,
.
J/iN 2 L 379
Toledo Edison Company
-2_
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this
letter, the enclosures, and your response to this letter will be
placed in the NRC's Public Document Room, except as follows.
If
the enclosures contain information that you or your contractors
believe to be proprietary, you must apply in writing to this of fice,
within twenty days of your receipt of this letter, to withhold such
information from public disclosure. The application must include a
full statement of the reasons for which the information is considered
proprietary, and should be prepared so that proprietary information
identified in the application is contained in an enclosure to the
application.
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
V
['&
A
.
Gaston Fiorelli, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection keport
No. 50-346/78-29
cc w/encls:
Mr. T. D. Murray, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
/ TIC
U. Young Park, Power
Siting Commission