Forwards IE Inspec Rept 50-339/78-20 on 780718-20 During Which No Items of Noncompliance Were Noted
ML19294A350
Person / Time
Site: North Anna 
Issue date: 08/29/1978
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML19294A351 List:
References
NUDOCS 7810120087
Download: ML19294A350 (2)


See also: IR 05000339/1978020

Text

..

-

,

.

/, , , / ~

r <

f-

'

"

UNITED ST ATES

[{g* '%g

.

o,

NUCLEAR REGULATORY COMMISSION

'

' 7/

-

'

~

c([ k

R EGloN ll

-

\\

'

0

7

I

101 M AR IETT A ST R t E T, N.W.

  • g(,

8

ATLANTA, GEORGI A 30303

o, 4s w*]

bf

AUG 2 91978

In Reply Refer To:

RII: CPM

50-339/78-20

Virginia Electric and Power Company

ATTN:

Mr. W. L. Proffitt

Senior Vice President, Power

P. O. Box 26666

Richmond, Virginia 23261

Gentlemen:

This refers to the inspection conducted by Mr. C. R. McFarland of this

office on July 18-20, 1978, of activities authorized by NRC Construction

Dermit No. CPPR-78 for the North Anna Power Station, Unit 2, facility,

the discussion of our findings held with Mr. P. A. Slater at

a

,

the

__.1'sion of the inspection.

[

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective exa=inations cf procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforce =er.t matters and unresolved ite=s.

The status of these items

is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

tacument Roo m.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

=ake a written application within 20 days to this office to withhold

such information from public disclosure. Any such application =ust

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary infor=ation identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

][L f % D WS ?

_

.

.'

n

_

Virginia Electric and Power Company

-2-

AU6 2 9 II/I

-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Sincerely,

Lb ph

.-

Charles E. hurph'y $

Reactor Construction and

Engineering Support granch

Enclosure:

Inspection Report No. 50-339/78-20

Mr. J. A. Ahladas, Station Manager

cc:

North Anna Power Station

Box 402

Mineral, Virginia 23117

Mr . S . V . Low ry

Senior Resident Engineer

P. O. Box 38

Mineral, Virginia 23117

,_,,,_,,,,,-.,,,--i '

i