Responds to NRC Re Violation Noted in IE Insp Rept 50-354/79-04.Corrective Actions:Bechtel Determined Surface Examination of Nuclear Class 2 Buttweld Ends Should Have Been Performed Per ASME Section III,NC-2539
ML19291C490
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/07/1979
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19291C489 List:
References
NUDOCS 8001240492
Download: ML19291C490 (2)


Text

-

Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineering and Construction Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

NRC INSPECTION REPORT 50-354/79-04 NO. 1 UNIT HOPE CREEK GENERATING STATION We have received and reviewed the report of your inspection conducted on September 12-14, 1979.

The report was trans-mitted with your letter of November 9, 1979 and received on November 16, 1979.

Our response for the item of noncompli-ance is as follows:

1.

Corrective steps taken by Bechtel and the results achieved:

a)

Bechtel has reviewed the Supplier's (Dravo) method for NDE of weld buildups applied to Nuclear Class 2 shop buttweld ends, and has determined that surface examination should have been performed as required by ASME Section III, NC-2539.

This surface examination was listed as an option in Dravo's General Fabrication Procedure, SP-1, in all revisions prior to Revision 7.

Procedure SP-1, Revi-sion 7, dated July 26, 1979, requires weld buildups to be surface examined by either MT or PT, along with RT as required.

b)

'Bechtel has initiated a request to Dravo to provide the rationale for not performing the required surface examinations, and to provide other information, in-cluding a listing of pipe spools involved.

Response

has been requested by January 4, 1979.

c)

Bechtel sill initiate any necessary corrective steps as the investigation proceeds and information becomes available from Dravo.

LV4i' 1794 303 8 oo124o

Mr. Boyce H. Grier, Director 12/7/79 2.

Corrective steps taken to avoid further items of noncom-pliance:

a)

Dravo has revised Procedure SP-1 (Revision 7, dated July 26, 1979) to provide for surface examination in strict compliance with ASME Code Section III, Para-graph NC-2539.

b)

Bechtel instructed to initiate any additional correc-tive steps necessary to avoid further noncompliance.

3.

The expected date for full compliance is July 1, 1980, at which time full documentation of the investigation will be available at the site.

If you require additional information, we will be pleased to discuss it with you.

Very truly yours, s

CC:

Office of Inspection and Enforcement Division of Reactor Construction and Inspection Washington, D.

C.

H. E. Morris (Bechtel)