Interim Deficiency Rept Re Dewatering & Erosion of Backfill. Util Met W/Nrc on 790109.Util Unable to Establish Definite Completion Date for Final Rept.Addl Update & Date for Final Rept Will Be Provided by 800215
ML19291C473
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 01/15/1980
From: Dutton D
GEORGIA POWER CO.
To:
References
X7BG03, X7BG3, NUDOCS 8001240466
Download: ML19291C473 (2)


Text

. .

Georgia Power Company Post Office Box 4545 L Atlanta, Georgia 3o302 Telephone 404 522-ww Vogtie Project Southern Cornpany Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6o11 January 15, 1980 United States Nuclear Regulatory Commission File: X7BG03 Office of Inspection and Enforcement Log: Gri-551 Region II - Suite 3100 -

101 Marietta Street, N.W.

Atlanta, GA 30303 Ati;n: Mr. James P. O'Reilly

Reference:

RII:JP0; 50-424; 50-425; Interim Report of Potential 10CFR50.55e (Dewatering and Erosion of Backfill)

Gentlemen:

On November 14, 1979 Mr. E. D. Groover, QA Site Supervisor at Plant Vogtle, reported to your Mr. Tom Conlon that a potential reportable item under 10CFR50.55e existed at Plant Vogtle concerning dewatering and erosion of backfill.

Since our interim letter of Decembs'r 10, 1979, log GM-532, Georgia Power Company has transmitted four letters. to the NRC which provided the current status of our program. On January 9, l'980 Georgia Power Company personnel and representatives met with NRC I&E (Region and Headquarters) and NRR persnnnel in NRR's Washington offices to discuss this problem and the corrective action being taken. The information presented in this meeting was transmitted by our letter dated January 8,1960, log GM-544.

As a result of the meeting in Washington, my January 10, 1980 letter, log GM-546, to you addresses any concerns discussed in the meeting and provides the current status.

At this time, Georgia Power Company is still unable to establish a definite completion date for the final report. An additional update and a date for the final report will be provided by February 15, 1980.

g ry tru y urs, r

WDoug Dutton

  • Project General Manager CWH:db, xc:v0.S.NuclearRegulatoryCommission 7oA gO Attn: Victor Stello, Jr., Director jI74 i 23 Urn.'

Office of Inspection and Enforcement O Washington, D.C. 20555 M. D. Hunt, NRC Region II 8001'240 M 3

United States Nuclear Regulatory Comission Attn: Mr. James P. O'Reilly Page 2 January 15, 1980 xc: J. H. Miller, Jr.

F. G. Mitchell, Jr.

R. J. Kelly C. F. Whitmer R. E. Conway D. E. Dutton J. T. Beckham, Jr.

R. Staffa K. M. Gillespie L. T. Gucwa C. R. Miles, Jr.

E. D. Groover D. L. McCrary R. A. Thomas

0. Batum .

J. A. Bailey -

~

M. Z. Jeric B. L. Lex

  • s 4

e t

o 1794 25.1.