ML19291C272

From kanterella
Jump to navigation Jump to search
Forwards Deficiency Rept 79-07 Re Refueling Water Storage Tank Capacity
Date released: 11/01/2019 Download: ML19291C272


Deficiency Rept 79-07:on 800116,during Prototype Testing, Isolation Block Valve Failed to Fully Close Under Design Flow Conditiions.Cause by Manufacturer Error in Determining Size of Valve Operator.Valve Operator Will Be Modified
ML19291C280
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/16/1980
From:
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291C280 (1)
Forwards Deficiency Rept 79-07 Re Refueling Water Storage Tank Capacity
ML19291C271
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/16/1980
From: Parker W
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19291C271 (1)