APPENDIX A NOTICE OF VIOLATION Long Island Lighting Company Docket No. 50-322 This refers to the inspection conducted by representatives of the Region I (Philadelphia) office at the Shoreham Nuclear Power Station, Shoreham, New York, of activities authorized by MRC Construction Permit No. CPPR-95.
During this inspection conducted on August 13-16, 1979, the following apparent item of noncompliance was identified:
Criterion V of Appendix 8 of 10 CFR 50 requires that " Activities affecting quality shall be prescribed by documented instructions, procedures or drawings
...and shall be accomplished in accordance with these instructions, procedures or drawings...." The Shoreham Nuclear Power Station FSAR, Section 17.1.5.B requires that activities affecting the quality of category 1 structures, systems and components are performed and documented in accordance with approved instructions, procedures, specifications and drawings.
Specification SH-1-159, Section 1.4.6 requires that all work shall be done in strict accordance with latest issues of approved drawings.
Contrary the the above, on August 13, 1979, battery room ventilation control panels PNL-VC16, VC17 and VC18 were installed without apprcved engineering drawings.
This item is an infraction.