Responds to NRC 791012 Ltr Re Violations Noted in IE Insp Rept 50-322/79-12.Corrective Actions:Engineering Evaluation & Rework to Be Completed by 800101 & Drawings Made Available.Const Personnel Advised of Spec Requirements
ML19291C169
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/19/1979
From: Wofford A
LONG ISLAND LIGHTING CO.
To: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19291C167 List:
References
NUDOCS 8001230058
Download: ML19291C169 (2)


Text

.

E

- X,C, O '

LONG ISLAND LIGHTING COM PANY 175 EAST OLD COUNTRY ROAD H I C K S V I L L E, NEW YORK 11801

^~oacw w. worroao SNRC 449 viCE PetESeOENT November 19, 1979 Mr. Robert T. Carlson, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 NRC Inspection No. 79-12 Shoreham Nuclear Power Station - Unit No. 1 Docket No. 50-322

Dear Mr. Carlson:

This letter responds to your letter of October 12, 1979, which forwarded the report of the inspection of activities author-ized by NRC License No. CPPR-95, conducted by Messrs. Toth and Narrow of your office on August 13-16, 1979. The letter stated that it appeared that one of our activities was not conducted in full compliance with NRC requirements. The apparent noncompliance and our response follow:

Apparent Noncompliance with 10CFR50, Appendix B, Criterion V, and FSAR Paragraph 17.1.5B Contrary to the above, on August 13, 1979, battery room ventilation control panels PNL-VC16, VC17 and VC18 were installed without approved engineering drawings.

Corrective Action and Results Failure to obtain approved mounting drawings for Panels PNL-VC16, VC17 and VC18 has been documented on a nonconformance report. Engineering evaluation of the nonconformance and completion of any necessary rework will be accomplished by January 1, 1980. Location drawings for the above panels are available at the construction site.

1, "I ,9 \

-F mie500 5g,a

ND ISt.AND L.lGHTING COM PANY Mr. Robert T. Carlson November 19, 1979 U.S. Nuclear Regulatory Commission, Region I Page 2 Final installation inspection of the panels had not been performed by Field Quality Control at the time of the NRC inspection.

Since approved mounting drawings are required by FQC in order to perform their final inspection, this discrepancy would have been observed and corrected at that time.

Steps Taken to Prevent Recurrence Responsible construction supervisory personnel have been advised of the NRC inspection finding, and specification requirements for panel mounting have been emphasized to them.

Date Full Compliance Will Be Achieved Full compliance will be achieved by January 1, 1980. A final report will be submitted by January 31, 1980.

Very truly yours, A' l c O ,, ~*

A. W. Wofford Vice President

n. ,y 1,/ '/ l //

C=g - _