Submits Info in Response to NRC 791005 Ltr Re Possible Boron Dilution Events.Forwards List Re Scope of Sys Examined for Boron Dilution Analysis
ML19291C127
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/15/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
2-010-14, 2-10-14, NUDOCS 8001220424
Download: ML19291C127 (2)


Text

.

sa:i w; 7 d,)

e ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK. ARKANSAS 72203 (501)371-4000 January 15, 1980 2-010-14 Director of Nuclear Reactor Regulation ATTN: Mr. R. W. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Boron Dilution Analysis (File: 2-1510)

Gentlemen:

The following is provided in response to your October 5, 1979 letter concerning possible boron dilution events:

1) Combustion Engineering has recently completed analyses for Arkansas Nuclear One - Unit 2 which identify and evaluate the potential for possible boron dilution events to lead to inadvertant reactor criticality. The systems included in these analyses are listed in Attach-ment 1. No postulated dilution scenario has been iden-tified which continues until reactor criticality. Suf-ficient design provisions, administrative controls and corrective actions are available to ensure that the operator can detect and terminate boron dilution events before the shutdown margin is lost.
2) We are in the process of reviewing procedural changes provided by Combustion Engineering as part of the above mentioned analyses. We will provide you with copies of any amended procedures as they become effective. We expect to complete our review of the applicable proce-dures by March 1, 1980.

Very truly yours,

.bwe. r4 David C. Trimble Manager, Licensing 253 DCT:M0W:skm veveen v. cote souTs uritiTies sysTev 8@ 226

Table 1 Scope of Systems Examined for ANO-2 Boron Jilution Analysis Chemical and Volume Control System .

1. Letdown and Purification Portion
2. Reactor Coolant System Volume Control Portion
3. Charging Portion
4. Makeup Portion (for chemical makeup, reacto'.' coolant system makeup, fuel pool makeup and tank makeup within miscellaneous systems)

Fuel Pool System i

1. Purification Portion
2. Cooling Portion
3. Fuel Pool Makeup Safety Injection System (ECCS)/Containnent Spray System
1. Sodium Hydroxide Injection Portion
2. Injection Mode Components and Interfaces
3. Recirculation Mode Components and Interfaces
4. Fuel Pool System Interfaces Waste Management System
1. Cleanup Portion Plant Water Systems
1. Service Water System
2. Component Cooling Water System
3. Demineralized Makeup Water System Reactor Coolant System 1788 254