Forwards IE Insp Rept 50-423/79-09 on 791024-26.No Noncompliance Noted
ML19291C121
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/16/1979
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19291C122 List:
References
NUDOCS 8001220235
Download: ML19291C121 (2)


See also: IR 05000423/1979009

Text

e

e

TS<-

, , ,

UNITED STATES

j

jo

NUCLEAR REGULATORY COMMisslON

y(

q

REGli'Nl

$ ,.y

C

631 PARK AVENUE

w

f

KING OF PRUS$1 A, PENN5YLVANIA 19406

s +~ . f

...

Docket No. 50-423

D I C M78

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-423/79-09

This refers to the inspection conducted by fir. A. Cerne of this office on

October 24-26, 1979, at the Millstone Nuclear Power Station, Unit 3 at Waterford,

Connecticut, of activities authorized by NRC License No. CPPR-ll3 and to the

discussions of our findings held by Mr. Cerne with Messrs. D. Diedrick and S.

Orefice of your staff at the conclusion of the inspection, and to a subsequent

telephone discussion between Mr. Orefice and others and Mr. Cerne on October 31,

1979.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the Public

Document Room.

1788

272

2:033 5

3001

&

.

.

Northeast Nuclear Energy Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-

_

[ Robert T. Carlson, ChiefW.bww

-

Reactor Construction and Engineering

Support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-423/79-09

cc w/ encl:

K. W. Gray, Construction Quality Assurance Lead

H. R. Nims, Director of Nuclear Projects

J. F. Opeka, Station Superintendent

J. R. Himmelwright, Licensing Safeguards Engineer

1788 273