g 2 5 1979 Generic Task No. A-17 NOTE T0:
J. Zwolinski M. Srinivasan H. George D. Fischer T. Scarbrough FROM:
J. Angelo
SUBJECT:
TECHNICAL ASSISTANCE ON TASK A-17 By letter dated June 20, 1979 from Sandia Laboratories to S. H. Hanauer, a number of questions were raised concerning the alignment and operation of plant systems.
The answer to these questions is gemane to detailed structuring of fault trees.
You are requested to research the questions in your particular area (decay heat removal, reactor subcriticality, reactor coolant pressure boundary, support systems, and fault tree structures) and prepare a reply to assist the Sandia personnel in their task of structuring the fault trees.
Ycu are urged to provide me with a reply as quickly as you possibly can, and you need not wait until you have all the answers.
I can " feed" answers to Sandia on a piece-meal basis as you complete the work.
I have made a tentative distribution of the specific questions which are contained in the enclosed letter. The distribution is as follows:
Question Review j7}4
]g4 No.
Item Ared 1.
CVCS Heat Tracing RS (Zwolinski)
Boration Using BIT RS (Zwolinski) 3.
Reactivity Changes Due to Boron Concentration Changes RS (Zwolinski) 4.
Reactor Shutdown from Power RS (Zwolinski) 5.
Decay Heat Removal Using Main Feed Pumps DHR (Fischer) 6.
Recirculation Lines & Pump DHR (Fischer)
Perfomance (General Area by Angelo) 7.
Decay Heat Removal Using Primary Systems DHR (Fischer) 8 001110415 8.
Reactor Coolant Press. & RCS RCPB (George) uverpressurization tallure h
O JUN 2 51979 9.
Combination of Equipment DHR, RS & RCPB Out of Service 10.
Natural Circulation Coolant Flow DHR (Fischer) 11.
Maintenance of Hot Shutdown DHR(Fischer) 12.
Turbine - Driven Pump Failure DHR (Fischer) 13.
Power - Operated Relief Valves RCPB (George)
(Also M. Srinivasan 14.
Review of Operating Experience RS, RCPB & DHR Please review the information above and the enclosed letter with a list of 14 questions and then meet with me on June 27, 1979, to discuss the way in which these items can be answered.
John Angelo, Task Manager Generic Task No. A-17
Enclosure:
tendia Letter dated June 20, 1979 cc w/o enclosure:
177A 1n-M Aycock I / J 't IUD S. Hanauer J. A. Norberg