Discusses Fault Trees Series 5.3 Depicting RCPB Safety Function Completed Jul 1979 by Sandia Labs
ML19291C066
Person / Time
Issue date: 08/06/1979
From: Angelo J
Office of Nuclear Reactor Regulation
To: Hanauer S
NRC - TMI-2 UNRESOLVED SAFETY ISSUES TASK FORCE
References
REF-GTECI-A-17, REF-GTECI-SY, TASK-A-17, TASK-OR NUDOCS 8001110354
Download: ML19291C066 (3)


Text

.

b UNITED STATES E'

3 NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

% *..+ /

AUG G$5 Generic Task No: A-17 MEMORANDUM FOR: Stephen H. Hanauer, Director, Unresolved Safety Issues Program FROM:

John Angelo, fask Manager, Generic Task No. A-17

SUBJECT:

FAULT TREES FOR THE REACTOR COOLANT PRESSURE B0UNDARY (RCPB)

SAFETY FUNCTION FOR GENERIC TASK N0. A-17, SYSTEMS INTERACTION IN NUCLEAR POWER PLANTS Enclosed are copies of the Figure 5.3 series of fault trees which depict the reactor coolant pressure boundary (RCPB) safety function. This series of fault trees was completed by Sandia Laborator;es during the month of July 1979 and are currently under review and evaluation by members of the Unresolved Safety Issues Program assigned to Task A-17 and by other selected persons.

The fault trees will be discussed with Sandia Laboratories at a meeting to be held on August 8-9, 1979 in Albuquerque, New Mexico.

Any corrections to the fault trees that may arise because of the NRC staff review, or as a result of further work by Sandia Laboratories, will be made to the computer code so that subsequent analysis of the fault tree using the Set Equation Transfonnation System (SETS) will be based on the corrected fault trees.

Sandia Laboratories does not propose to replot the fault trees until the final version is plotted for the final report on Phase I of this task.

We intend to make hand-written changes to the fault trees in the interim until the final plots are made.

However, if the corrections turn out to be exten-sive, we may reconsider this proposal.

I intend to notify holders of copies of the fault tree what hand-written changes should be made to keep their copies current.

Copies of these fault trees are being given a limited distribution. A number of additional copies will be held in the Task Manager's office for inspection or loan to persons on the distribution list for this memorandum who are not recipients of the fault trees. All persons on the distribution list for this memorandum are invited to present their coments or questions to the Task Manager.

Sandia Laboratories is now working on fault ees for the other two safety functions: Decay Heat Removal (DHR) and Re tor Subcr' icality (RS).

/

John Angelo, ask Manager

[

Generic Task A-17

Enclosure:

Fault Trees on RCPB Figures 5.'. 5.3-1 through b.3-7 cc w/ enclosure: See next page l733 34) 80011103 5t

Stephen H. Hanauer AUG 619PJ cc: Mr. K. S. Canady Duke Power Company P. O. Box 33189 422 South Church Street Charlotte, North Carolina 28242 Mr. Mark Wisenberg (2)

Tennessee Valley Authority 303 Power Building Chattanooga, Tennessee 37401 Mr. F. Stetson Atomic Industrial Forum 7101 Wisconsin Avenue Washington, D. C.

20014 1733 342

.