Text
-
OPERATING DATA REPORT DOCKET NO. 050-0298 DATE 12-7-79 COMPLETED BY P.
L. En111nger TELEPHONE 402-825-3811 OPERATING STATUS Notes
- 1. Unit Name:
Cooper Nuclear Station November 1979
- 2. Reporting Period:
2381
- 3. Licensed Thermal Power (MWt):
836
- 4. Nameplate Rating (Gross MWe):
778
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
787 764
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number.1 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions. If Any:
N0ne This Month Yr. to.Date Cumulative
- 11. Hours in Reportin; Period 720.0 9d16.0 47.407.0 _
- 12. Number Of Hours Reactor Was Critical 581.1 7038.4 40.441.1
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator On.Line 571.2 6928.4 39,731.6
- 15. Unit Reserve Shutdown Hours nn nn nn
- 16. Gross Thermal Energy Generated (MWH) 1.126.128 14.117.784 74.541.942
- 17. Gross Electrical Energy Generated (MWH) 375,084 4.633,548 23.991.434
- 18. Net Electrical Energy Generated (MWH) 361,521 4,466,581 23,129,920
- 19. Unit Service Factor 79.3 86.4 83.7
- 20. Unit Availability Factor 79.3 86.4 83.7
- 21. Unit Capacity Factor (Using MDC Net) 65.7 72.0 61.7
- 22. Unit Capacity Factor (Using DER Net) 6Q 71.6 62.6
- 23. Unit Forced Outage Rate 20.7 4.2 4.7
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
Re fnpling and M14ntennnce. Mnrch 15. 1980. 8 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status iPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1579 356 7912140.3 7 7 rum
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-0298 UNIT Cooper Nuclear Stat.
DATE 12-7-79 COMPLETED BY P. L. Ballinger 402-825-3811 TELEPHONE MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) g 737 0
j7 2
727 ig o
3 727 g9 0
4 713 20 3
383 5
739 21 6
771 22 544 722 7
23 611 8
722 24 601 9
722 569 25 10 713 26 705 419 27 692 522 697 12
- g 434 697 13 29 14 261 694 30 15 0
31 16 0
INSTRUCTIONS On this format.!ist the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77) 1579 357
050-0298 DOCKET NO.
UNIT SilUTDOWNS AND POWER REDUC 110NS UNIT N AME Cooper Nuclear Stat.*
DATE 12-7-79 COMPLETED BY P. L. Ballinger November REPORT MON 111 1ELEPil0NE 402-825-1R11 e.
5;
'E E
c Licensee Et E"1.
Cause & Corrective No.
Date h
jl k
) {E ~$
Event h
Action to g=
5 g
Report #
vO u
Prevent Recurrence F
g 6
79-12 791111 S
0 H
4 N/A N/A N/A Power was reduced to allow the ex-change of control rod patterns and to test the turbine control system.
79-13 791113 F
5 H
4 50-298-79-37 Diesel generator #1 & #2 were inoper-able at the same time.
Power was re-duced for a normal station shutdcwn as required by Tech. Specs. Diesel gen-erator #1 was subsequently repaired and shutdown terminated. The reactor was returned to a reduced power oper-ation pending repair and inspection of the #2 diesel generator.
79-14 791114 F
148.8 A
2 50-298-79-36 Reactor was shutdown because the re-pair and annual inspection of the #2 diesel generator was not completed in seven days as required by the Tech.
snnce.
nfocoi gonor,en. M7 ugg
.g_
paired, inspected and tested and the reactor m
" 0 E Nt d M fruEOS Is" I "'
M F: Forced Reason:
Method:
N S: Scheduled A Equipment F.ilure(Explain) 1 -Manual for Preparation of Data d
B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C. Refueling 3 Automatic Saam.
Event Report (LER) File (NURI.G-4 D-Regulatory Restriction 4-Other (Explain) 0161)
..J1 E-Operator Training & Ucense Examination m
F-Administrative 5
G-Operational Error (Explain)
Eshibit I - Same Source (9/77)
Il-OLher (Explain)
COOPER NUCLEAR STATION OPERATIONS NARRATIVE November 1979 Power was reduced on November 11, 1979 to allow the exchange of control rod patterns (Sequence A-2 to Sequence B-2) and to test the turbine control system.
On November 13, 1979, diesel generator #1 would not start during per-formance of a surveillance procedure and was declared inoperable.
Diesel generator #2 was undergoing its annual inspection and thus was also inoperable. Power was reduced for a normal station shutdown as required by Technical Specifications. Diesel generator #1 was sub-sequently repaired, tested, and declared operable and the shutdown terminated. The reactor returned to reduced power operation pending completion of repair and annual inspection of the #2 diesel generator.
Reactor was shutdown on November 14, 1979 because the repair and annual inspection of the #2 diesel generator was not completed in seven days as required by Technical Specifications. The diesel generator #2 was repaired, tested, and declared operable and the reactor returned to normal operation after a 148.8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> outage.
Reactor operated with no additional unscheduled power reductions or outages for the balance of the month.
1579 359
.