Discusses IE Insp Repts 50-289/77-04 & 50-320/77-08 on 770217-18 & 22-23.Insp Repts & Notice of Violation Encl
ML19291B672
Person / Time
Site: Crane  Constellation icon.png
Issue date: 04/06/1977
From: Nelson P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19291B668 List:
References
NUDOCS 7911110071
Download: ML19291B672 (2)


See also: IR 05000289/1977004

Text

-

..

n

[J#

%

UNITED STATES

,

NUCLEAR REGULATORY COMMisslON

,p ,)h{}. j

-

nEcion i

g

631 PARK AVENUE

e*.y-

-

f< g ~

KING OF P4US$1 A. PENNSYl.V ANI A 19404

.....

Docket Nos. 50-289

50-320

Metropolitan Edison Company

ATTN:

Mr., R. C. Arnold

Vice President

P. O. Box 542

Reading, Pennsylvania 19603

i

Gentl emen:

4

Subject:

Inspection 50-289/77-04 and 50-320/77-08

This refers to the inspection conducted by Dr. R. Bores of this office

on February 17,18, 22 and 23,1977, at Three Mile Island Nulcear Station

site, Middletown, Pennsylvania and at the corporate offices in Reading,

'

Pennsylvania, of activities authorized by NRC License Nos. OPR-50 and

!

CPPR-66, and to the discussions of our findings held by Dr. Bores with

I

Mr. Klingaman, Mr. Miller, and other members of your staff at the con-

(]

clusion of the inspection.

'

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Our inspector also verified the steps you had taken to correct the items

of noncompliance brought to your attention in a letter dated September

16, 1976. We have no further questions regarding your action at this

time.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

A.

These items of noncompliance have been categorized into the levels

as described in our correspondence to you dated December 31, 1974.

This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice", Part 2, Title 10. Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a writ en statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

.\\

will be achieved.

15C2

341

'9 1110 02L

-

[

d

.

.

,,

l

(,1

M'tropolitan Edison Company

2

e

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

,

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

i

which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as possible

'

into a separate: part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

'

the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

!

Sincerely,

1

-

)f

Yw

'

Paul R. Nelson, Chief

Fuel Facility and Materials Safety

Branch

Enclosures:

3

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection Report

,

Numbers 50-289/77-04 and 50-320/77-08

cc w/encis:

R. L. Wayne, QA Manager, Design & Construction

T. M. Crimmins, Jr., Safety & Licensing Manager

R. W. Heward, Jr., Project Manager

W. A. Verrochi, Vice President, Design & Construction

G. Miller, Unit 2 Superintendent

Gerald Charnoff, Esquire

Miss Mary V. Southard, Chairman, Citizens for a Safe Environment

(Without Report)

J. J. Colitz, Unit 1 Superintendent

J. G. Herbein, Manager, Generation Operations - Nuclear

_

f

1532

342

,

-

-

.

.

.-

_.

-

..

-