ML19291B173
| ML19291B173 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/17/1979 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC COMMISSION (OCM) |
| Shared Package | |
| ML19291B174 | List: |
| References | |
| NUDOCS 7908290583 | |
| Download: ML19291B173 (1) | |
Text
.. -
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.0, BOX 8699 PHILADELPHI A. PA.19101 (215) 841 4o0o August 17, 1979 Director of Licensing U. S. Nuclear Regulatory Commission Washington, DC 20545
Dear Sir:
Attached please find a revised Peach Bottom Atomic Power Station Decommissioned Unit Number 1 Annual Report. The original report was submitted on July 19, 1979
'"he report is in compliance with the Technical Specifications 8.2.h(a).
8.2.h Reports (a) An annual report shall be submitted to the Director of Licensing, U. S. Atomic Energy Commission, Washington, DC 205h5, describing the results of facility radiation surveys, the performance of security and curveillanco measures. This report shall be included as a section of the annual report submitted for Units 2 and 3 Very truly ours, i
W. M. Alden Engineer-In-Charge Nuclear Section Generation Division WCB:bam Attachment
~
2012
,,t' 7908290553