05000277/LER-1979-032-01, /01T-1 on 790626:insp of Seismic Class I Supports Revealed 92 W/Safety Factors of Less than 5,w/8 Having Safety Factors of Less than 1.Caused by Inadequate Design. All Mods Completed by 790719

From kanterella
(Redirected from ML19291B127)
Jump to navigation Jump to search
/01T-1 on 790626:insp of Seismic Class I Supports Revealed 92 W/Safety Factors of Less than 5,w/8 Having Safety Factors of Less than 1.Caused by Inadequate Design. All Mods Completed by 790719
ML19291B127
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/26/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19291B126 List:
References
LER-79-032-01T, LER-79-32-1T, NUDOCS 7908290455
Download: ML19291B127 (1)


LER-1979-032, /01T-1 on 790626:insp of Seismic Class I Supports Revealed 92 W/Safety Factors of Less than 5,w/8 Having Safety Factors of Less than 1.Caused by Inadequate Design. All Mods Completed by 790719
Event date:
Report date:
2771979032R01 - NRC Website

text

LC FORAl Em6 *"

~

U.~E NUCLEAR REGUL'A1084Y COMMisSIUN Tit Unit 2 LICENSEE EVENT REPORT Report No. 2-79-32/1T-1

  • UONTROL 8 LOCK:

l l

l l

l (PLEASE PRINT OR TYPt! ALL REOulRED INPoRMATIONI lPlAlPIB lS l 2 l@l 010l lO IOlO!0lOl-l0101@l4l1l1]1l1l@l l

l@

i 4 9 LICENSEE CODE to it UCENSE NUMSER 25 24 LICENS& TYPE 40 57 CAT bd ON'T L l@l015 1 01 -l 012 17 17 }@l 0 l 6 I 2161719 l@l018121017 9 l@

1

$ URCs 4

60 St DOCX ET NUMS ER 68 4,9 EVENT QATE le 7S REPORT CATE 80 EVENT DESCRIPTION AND PROSA8LE CONSEQUENCES h 3

2 I In restonse to the analysis required by IE Bulletin 79-02, Rev.1,12h3 I

w,j i seismic class I supports have been analyzed. Ninety two supports have i

"TI I safety factors less +han five based on a design basis earthquake. Eight i

i EI of these have safety factors less than one; i.e., may fail during a de-t

)

o I

sian baeis earthcuake. Safety significance is mini ~.1, because calcula-l

)

7 l

tions indicate sutports will withstand the operating basis earthquake.

I O

a l

O&SR Co-4 ttee approved continued plant operation.

I 80 8 9

  • *I:*E
  1. 'o*E SSCYO$E COMPONENT CODE SUS " E 3O S

3 38 CO CO LS la l@ La_]@ LA_l@ I Z l z l z i z i z i z l@ LZ l@ Iz @

)

9 8

9 to 11 12 13 18 19 _

20 SE QUE NTI AL OCCURRENCE REPORT HEVISION LE RIRO EVENT Y EAR REPORT NO.

CODE TYPE NO.

@,ajog 17191 l-l 1013I2l l-1 10l1l lT I L---J 11 21 22 23 24 28 77 28 29 30 38 32 METh HOURS 22 S 8 i POR 8.

SU L MANUFAC RER N A N

P NT l F l@[ F_j@

lZl@

y@

l0 IO l0 l0 l

[ y l@

l N l@

l Z l@

lZI9l919l@

33 34 3S 36 37 40 45 42 43 44 47 g

CAUSE DESCRIPTION AND CORRECTIVE ACTIONS 27 i

o i The cause of this occurrence was inadequate initial support design.

I i6i l

Seismically qualified pipe nodifications of all eight supports were i

2 I ccepleted on July 19, 1979 i

ila l I

i

.t l

l 8 g 80 ST 5

% POWER OTHER STATUS Ots RY DISCOVERY OESCRIPTION l El@ l110 l0 l@l U/3 at 100%

l [Dl@l Work in IE Bulletin 79-02 l

i 3

ACTIVITY CO TENT RELEASED OF RELE ASE AMOUNT OF ACTivlTY LOCATION OF RELEASE l

N/A l

l N/A l

LZ_] @ l Z l@SES i

c-PEnso~~EL E POS NUM9ER TYPE

DESCRIPTION

l 0 l 0 l 0 l@[ Z_J@l N/f l

i 7

,E RSO~~E L iN;ULS eESCRi, TION @

n/A

~UM8ER l010101@l I

i 8 9 11 12 80.,

LOSS 08 OH DAuAGE TO FACILITY r;'igi yfi yoo82909ss i

oc"'"'o~

e 9 10 80

.SUEJ81 n/A

///M#uv m

DESCRIPTION

i_x_

i i i iiiiiiiiiI:

2 o

g / ' [/ L/

/

G8 69 80 ;

V # "

e 4 to V M.rJ. Cooney /

(215) 841-5020 g

NAME OF PREPARER PHONE:

o