ML19291B016
| ML19291B016 | |
| Person / Time | |
|---|---|
| Site: | Hartsville |
| Issue date: | 06/29/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19291B017 | List: |
| References | |
| NUDOCS 7908290197 | |
| Download: ML19291B016 (2) | |
See also: IR 05000518/1979011
Text
C
'o,
UNITED STATES
,y
, gf( ,g
NUCLEAR REGULATORY COMMISSION
4.
e
REGION 11
U[
0,
101 MARIETTA si., N.W.. sUlTE 3100
% .*.%'
o
ATLANTA, GEORGIA 30303
...
In Reply Refer To:
RII:WBS
JUN 2 9 2
50-518/79-11
50-519/79-11
50-520/79-11
50-521/79-11
Tennessee Valley Authority
Atta:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, Tennessee 37401
Gentlemen:
This refers to the inspection conducted by W. B. Swan of this office on
May 24-26, 29-30 and June 1-2, 1979 of activities authorized by NRC
Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for
the Hartsville Nuclear Plant facility, Units A1, A2, B1 and B2, and to
the discussion of our findings held with R. T. Hathcote at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code- of Federal Regulations, a copy of this letter and
the enclosed inspectu n report will be placed in the NRC's Public
Document Room.
If t! s report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
7908290197
20i3
259
.
.
M2EE
Tennessee Valley Authority
-2-
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
,
/$ $
C. E. Murphy, Chief'
Reactor Construction and
Engineering Support
Enclosures:
Inspection Report Nos. 50-518/79-11,
50-519/79-11, 50-520/79-11 and
50-521/79-11
cc w/ enclosures:
J. E. Gi11 eland
Assistant Manager of Power
500C Chestnut Street Tower II
Chattanooga, Tennessee 37401
R. T. Hathcote, Project Manager
P o '., ')ffice Box 2000
Hartsville, Tennessee 37074
J. F. Cox
400 Commerce Street
W9D214
Knoxville, Tennessee 37902
J. E. Wills, Project Engineer
400 Chestnut Street Tower II
Chattanooga, Tennessee 37401
2013
260