Forwards IE Insp Repts 50-518/79-11,50-519/79-11, 50-520/79-11 & 50-521/79-11 on 790524-26,29-30 & 0601-02. No Noncompliance Noted
ML19291B016
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 06/29/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19291B017 List:
References
NUDOCS 7908290197
Download: ML19291B016 (2)


See also: IR 05000518/1979011

Text

C

'o,

UNITED STATES

,y

, gf( ,g

NUCLEAR REGULATORY COMMISSION

4.

e

REGION 11

U[

0,

101 MARIETTA si., N.W.. sUlTE 3100

% .*.%'

o

ATLANTA, GEORGIA 30303

...

In Reply Refer To:

RII:WBS

JUN 2 9 2

50-518/79-11

50-519/79-11

50-520/79-11

50-521/79-11

Tennessee Valley Authority

Atta:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by W. B. Swan of this office on

May 24-26, 29-30 and June 1-2, 1979 of activities authorized by NRC

Construction Permit Nos. CPPR-150, CPPR-151, CPPR-152 and CPPR-153 for

the Hartsville Nuclear Plant facility, Units A1, A2, B1 and B2, and to

the discussion of our findings held with R. T. Hathcote at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code- of Federal Regulations, a copy of this letter and

the enclosed inspectu n report will be placed in the NRC's Public

Document Room.

If t! s report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

7908290197

20i3

259

.

.

M2EE

Tennessee Valley Authority

-2-

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

,

/$ $

C. E. Murphy, Chief'

Reactor Construction and

Engineering Support

Enclosures:

Inspection Report Nos. 50-518/79-11,

50-519/79-11, 50-520/79-11 and

50-521/79-11

cc w/ enclosures:

J. E. Gi11 eland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

R. T. Hathcote, Project Manager

P o '., ')ffice Box 2000

Hartsville, Tennessee 37074

J. F. Cox

400 Commerce Street

W9D214

Knoxville, Tennessee 37902

J. E. Wills, Project Engineer

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

2013