ML19291A998
| ML19291A998 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 08/14/1979 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Eric Turner HOUSTON LIGHTING & POWER CO. |
| References | |
| NUDOCS 7908290151 | |
| Download: ML19291A998 (1) | |
Text
e Prog n
?>g UNITED STATES g-
{ 8 7 3 =,-q g/ c NUCLEAR REGULATOnY COMMISSION g
o,'!d !N[d"si. [
g/ \\
FlEGION f -
611 RYAN PLAZA Driv SUITE 1000
'V AR LINGToN, TE >.,16012 August 14, 1979 Lt Reply Refer To:
RIV Docket Nos. 50-498/IE Information Notice No. 79-20 50-499/IE Information Notice No. 79-20 Houston Lighting & Power Company ATTN:
Mr. E. A. Turner, Vice President Power Plant Construction and Technical Services Post Office Box 1700 Houston, Texas 77001 Gentlemen:
With this IE Information Notice the Nuclear Regulatory Commission is extending an existing mechanism previously used for informing facility licensees of significant operating events to include informing operator licensees of significant events which could impact on conditions of their NRC licenses.
It is requested that the facility licensee provide copies of this IE Information Notice to all NRC licensed individuals at the facility.
No specific response is requested at this time.
If you have questions regarding this matter please contact the Director of tl..e appropriate NRC Regional Office.
Sincerely, f
+. x4,, /u'b f j f
Karl V. Seyfrit Director
Enclosures:
1.
IE Information Notice No. 79-20 2.
List of IE Information Notices Issued in 1979 4 9 N 3e8-2013 142 7908290 / f/
G9
UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 IE Information Notice No. 79-20 Date:
August 14, 1979 Page 1 of 3 NRC ENFORCEMENT POLICY - NRC LICENSED INDIVIDUALS
Background:
In the past, NRC licensed individuals have been cited by the NRC for failure to comply with the conditions of their licenses. These items of noncompliance can generally be characterized as serious or repeated failures to follow reactor operating procedures. Two recent events involving the radiation overexposure of NRC licensed individuals through their violation of utility procedures, facility Technical Specifications and the Code or Federal Regulations have raised questions about the exercise of their responsibilities.
The purpose of this Information Notice is two-fold:
1.
To remind the NRC licensed individuals of their responsibilities, not only in the proper operation of the facility controls, but in compliance with the facility. administrative procedures; and 2.
To summarize the enforcement sancticas available to the NRC for use against licensed individuals.
Description of Circumstances:
1.
Responsibilities Facility licensees are charged with the responsibility to design, construct and operate their plants in accordance with NRC requirements to assure that public health and safety are protected.
The role of NRC licensed individuals is no less important in the overall Regulatory scheme.
The NRC recognizes that timely actions by NRC licensed indivi-duals are an important part of safety. Reliance on these actions is a part of the defense-in-depth concept. Specifically, the NRC requires that:
(1) Only licensed operators are permitted to manipulate the controls that directly affect reactivity (10 CFR 50.54(i))
(2) Licensed operators are require all times during the operation DUPLICATE DOCUMEN7'j Entire document previously entered into system under: iNo %..2f 2 %. 2f M 6 No. of pages: [/)}}