ML19291A070

From kanterella
Jump to navigation Jump to search
Responds to Re Deviations of Up to 10% of Overall Barrier Height Requirement.Such Deviation Does Not Decrease Effectiveness of Physical Protection Plan & Is Therefore Authorized
ML19291A070
Person / Time
Site: Wood River Junction
Issue date: 03/16/1979
From: Mccorkle G
NRC OFFICE OF ADMINISTRATION (ADM)
To: Bowers C
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
References
NUDOCS 7904070071
Download: ML19291A070 (1)


Text

3.,.-

p'

\\

f UNITE D STATES g g,,pr'g NUCLEAR REGULATORY COMMISslON g,t WASHINGTON, D. C. 20555

]/ j y

o, p.e.

%,O*#

ER 1 6 S79

  • ...=

SGPL:RBM 70-820 United Nuclear Corporation Recovery Operations ATTN: Mr. C. E. Bowers Plant Manager Wood River Junction, Rhode Island 02894 Gentlemen:

This is in response to your letter dated February 20, 1979 ident Nying deviations of up to 10 percent from the overall barrier height require-ment of 10 CFR 73.2(f)(1). We have determined that such a deviation does not decrease the effectiveness of your physical protection plan and is therefore authorized.

In order to formalize this determination, we are hereby amending Section 9.0 of Materials and Plant Protection Plan MPP-2 to your License No.

SNM-777 by adding License Condition 9.4.2 as follows, effective immediately.

9.4.2 The licensee is granted a limited exception to the requirements of 10 CFR 73.2(f)(1) in that the overall height of the protected area fence may be reduced by up to 10 percent of the required height to accommodate erosion control grading, frost heaves and excavation along the protected area perimeter.