ML19290G645
| ML19290G645 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/07/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19290G646 | List: |
| References | |
| NUDOCS 8012180214 | |
| Download: ML19290G645 (2) | |
See also: IR 05000364/1980044
Text
Y/0rL
\\
/
/pn ntaug'o
UNITED STATES
!" y g [,g
NUCLEAR REGULATORY COMMISSION
g
- c
e
REGION 11
o
', j
101 MARlETTA ST,, N.W., sulTE 3100
j
ATLANTA, GEORGIA 3o3o3
- . *
In Reply Refer To:
NOV 7
N
RI-I:GLT^
w
_dg-364/80-44'
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Bc,x 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by G. L. Troup of this office on
October 14-17, 1980, of activities authorized by NRC Construction Permit No.
CPPR-86 for the Farley facility, and to the discussion of our findings held with
W. G. Hairston, III at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of tne NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
,
y
cu
w
(
.c;;
Sincerely
,
,a
,~
,.
.
,
E
~
.
M
J. Philip Stohr, Chief
@ Fuel Facility and Materials
O
{
-
Safety Branch
Enclosure:
(See Page 2)
6012130 l @
,
Alabama Power Company
-2-
NOV 7
1980
,
Enclosure:
Inspection Report No. 50-364/80-44
cc w/ encl:
W. O. Whitt, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construct
an)
4
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
0. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services