ML19290F153
| ML19290F153 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 02/29/1980 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Nichols T SOUTH CAROLINA ELECTRIC & GAS CO. |
| References | |
| NUDOCS 8003180193 | |
| Download: ML19290F153 (1) | |
Text
'
/
'o, UNITED STATES t,
NUCLEAR REGULATORY COMMISSION
.E REGION 11 O
101 MARIETTA ST., N.W., SUITE 3100 f
ATLANTA, GEORGIA 30303 In Reply Refer To:
FEg 2 91980 RII:JP0 r-50H95 ~,
w re.
South Carolina Electric and Gas Company Attn:
T. C. Nichols, Jr., Vice President Power Production and System Operations Post Office Box 764 Columbia, South Carolina 29218 Gentlemen:
Enclosed is Supplement Information to IE Bulletin No.
01B.
This infor-mation is presented in the form of generic questions and nswers which will assist you in responding to the actions required of IE Bu letin No.79-01B with regard to your power reactor facility (ies) with an operating license.
d:
Should you have questions regarding this Supplement IflIormation, please contact this office.
Sincerely,
'd
_x u _.
m'>
ke James P. O'Reill Diredtor
Enclosure:
IE Bulletin No.79-01B Supplement Information 8 0 0 318 0l%
SSINS No.:
6820 Accession No..
UNITED STATES 7912190696 NUCI. EAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMEh7 WASHINGTON, D.C.
2,0555 February 29, 1980 IE Bulletin No.79-01B Supplement Information ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC ' Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No.79-01B.
This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.
The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.
It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.
Enclosure:
Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:
h ANO No. of pages:
[g v