ML19290F148
| ML19290F148 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 02/29/1980 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Clayton F ALABAMA POWER CO. |
| References | |
| NUDOCS 8003180187 | |
| Download: ML19290F148 (2) | |
Text
'o,,
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION n
I 3
A
.E REGION ll o,
f 101 MARIETTA ST., N.W., SUITE 3100 I
g s*
ATLANTA, G EORGIA 30303 In Reply Refer To:
FEB 2 9 th0 RII:JPO Q-3}8)
Alabama Power Company Attn:
F. L. Clayton, Jr.
Senior Vice President Post Office Box 2641 Birmingham, Alabama 35291 Centlemen:
Enclosed is Supplement Information to IE Bulletin No.79-01B.
This infor-mation is presented in the form of generic questions and answers which will assist you in responding to the actions required of IE Bulletin No.79-01B with regard to your power reactor facility (ies) with an operating license.
Should you have questions regarding this Supplement Informatic1, please contact this office.
Sincerely, o
j s
~
f'
- m. ww James P. O'Reilly Director
Enclosure:
IE Bulletin No.79-01B Supplement Information 8 0 0 318 0l'f]
{
FEB 291980 Alabama Power Company.
cc w/ enc 1:
A. R. Barton Executive Vice President Post Office Box 2641 Birmingham, Alabama 35291 J
T. Young Vice President-Production Post Office Box 2641 Birmingham, Alabama 35291 C. Biddinger, Jr.
Manager-Corporate Quality Assurance Post Office Box 2641 Birmingham, Alabama 35291 H. O. Thrash Manager-Nuclear Generation Post Office Box 2641 Birmingham, Alabama 35291 H. G. Hairston, III Plant Manager Drawer 470 Ashford, Alabama 36312 R. E. Ifo11 ands, Jr.
QA Supervisor Post Office Box U Ashford, Alabama 36312
SSINS No.-
6820 Accession No..
UNITED STATES 7912190696 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EhTORCEMEh"r WASHINGTON, D.C.
20555 February 29, 1980 IE Bulletin No.79-01B Supplement Information ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No.79-01B.
This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.
The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of C1 os IE Electrical Equipment installed at their respective facilities.
It should be recogni.ed that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.
Enclosure:
Generic Questions and Answers to IE Bulletin No.79-01B o
DUPLICATE DOCUMENT Entire document previously entered into s ste. u der:
7,,
7b ANO N o.
of pages: