Text
- '.
'o, UNITED STATES E'
'g NUCLEAR REGULATORY COMM SSION e
REGION 111 4
o,
,[
799 ROOSEVELT ROAD
%.*....[
GLEN ELLYN. ILLINOIS 60137 FF9 2 o war, Docket No. 50-266 Docket No. 50-301 Wisconsin Electric Power Company ATTN:
Mr. Sol Burstein Executive Vice President Power Plants 231 West Michigan Milwaukee, WI 53201 Gentlemen:
Enclosed is Supplement Information to IE Bulletin No.79-01B.
This information is presented in the form of generic questions and answers which will assist you in responding to the actions required of IE Bulletin No.79-01B with regard to your power reactor facilities with an operating license.
Should you have questions regarding this Supplement Information, please contact this office.
Sincerely, apa Yqi ames G. Keppl'p6r Director
Enclosures:
IE Bulletin No.79-01B Supplement Information ec w/ encl:
Mr. G. A. Reed, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR C. M. Trammell, ORB /NRR PDR Locm PDR NSIC TIC Sandra A. Bast, Lakeshore Citizens for Safe Energy Mr. John J. Duf fy, Chief Boiler Inspector, Department of Industry, Labor and Human Relations 8003140 M 3
UNITED STATES SSINS No.-
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7912190696 WASHINGTON, D.C.
20555 February 29, 1980 IE Bulletin No.79-01B Supplement Information ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No.79-01B.
This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.
The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.
It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.
Enclosure:
Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:
N[ hh ANO b
4 No. of pages: