ML19290E649

From kanterella
Jump to navigation Jump to search
Forwards Supplemental Info to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Response Required
ML19290E649
Person / Time
Site: Davis Besse 
Issue date: 02/29/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
References
NUDOCS 8003140333
Download: ML19290E649 (8)


Text

a aro

[e wc UNITED STATES

^

8' t

NUCLEAR REGULATORY COMMISSION 3 y.

c REGION lli TIC o,

[

799 ROOSEVELT ROAD j'

GLEN ELLYN. ILLINOIS 60137 Docket No. 50-346 Toledo Edison Company ANN:

Mr. Richard P. Crouse Vice President Nuclear Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

Enclosed is Supplement Information to IE Bulletin No.79-01B.

This (nformation is presented in the form of generic questions and answers shich will assist you in responding to the actions required of IE Bulletin No.79-01B with regard to your power reactor facility with an operating license.

Should you have questions regarding this Supplement Information, please contact this office.

Sincerely, hlh

  • w

/ James G. Kepple' Director

Enclosures:

IE Bulletin No. 79-OlB Supplement Information cc w/ enc 1:

Mr. T. Murray, Station Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Helen W. Evans, State of Ohio 8003140 3 3'S

UNITED STATES SSINS NO.-

6820 NUCLEAR REGULATORY COMMISSION Accession No.:

0FFICE OF INSPECTION AND ENFORCEMENT 7912190696 WASHINGTON, D.C.

20555 February 29, 1980 IE Bulletin No.79-01B Supplement Information ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No.79-01B.

This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.

The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.

It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.

Enclosure:

Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:

f h

ANO No. of pages: