ML19290E642
| ML19290E642 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point, Palisades File:Consumers Energy icon.png |
| Issue date: | 02/29/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dewitt R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8003140325 | |
| Download: ML19290E642 (8) | |
Text
- p* *8cg,'og UNITED STATES E'
NUCLEAR REGULATORY COMMISSION TC g-r REGION lli o,,
%, ' A#
d' GLEN ELLYN. ILLINOIS 60137
- ...+
fb N
Docket No. 50-155 Docket No. 50-255 Consumers Power Company ATTN:
Mr. R. B. DeWitt Vice President Nuclear Operations 212 West Michigan Avenue Jackson, MI 49201 Gentlemen:
Enclosed is Supplement Information to IE Bulletin No. 79-OlB.
This information is presented in the form of generic questions and answers which will assist you in responding to the actions required of IE Bulletin No. 79-OlB with regard to your power reactor facilities with an operating license.
Should you have questions regarding this Supplement Information, please contact this office.
Sincerely, h,,a.h /
2 2b - t jJamesG.Kepplr' Director
Enclosures:
IE Bulletin No.79-01B Supplement Information cc w/ encl:
Mr. D. P. Hoffman, Nuclear Licensing Administrator Mr. C. J. Hartman, Plant Superintendent Mr. J. G. Lewis, Manager Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC TIC Ronald Callen, Michigan Public Service Commission Myron M. Cherry, Chicago 800s24o 32g
UNITED STATES SSINS NO.:
6820 NUCLEAR REGULATORY COMMISSION Accession No.:
OFFICE OF INSPECTION AND ENFORCEMENT 7912190696 WASHINGTON, D.C.
20555 February 29, 1980 IE Bulletin No.79-01B Supplement Information ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No. 79-018.
This iniormation is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.
The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.
It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.
Enclosure:
Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:
-n M19e6%
s s
v
- < r No. of pages:
/M v