Forwards Supplemental Info to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Response Required
ML19290E630
Person / Time
Site: Rancho Seco
Issue date: 02/29/1980
From: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
References
NUDOCS 8003140310
Download: ML19290E630 (7)


Text

f b

n aseg

[o

),,

UNITED STATES 8\\'

NUCLEAR REGULATORY COMMISSION n

REGION V o,

g 1990 N. CALIFORNI A BOULEVARD e

SUITE 202, WALNUT CREEK PLAZA WALNUT CREEK, CAllFORNI A 94596 February 29, 1980 Docket No. 50-312 Sacramento Municipal Utility District P. O. Box 15830 Sacramento, California 95813 Attention:

Mr. John J. Mattimoe Assistant General Manager Gentlemen:

Enclosed is Supplement Information to IE Bulletin No.79-01B. This informatior: is presented in the form of generic questions and answers which will assist you in responding to the actions required of IE Bulletin No.79-01B witF regard to your power reactor facility (ies) with an operating licr Should you have questions regarding this Supplement Information, please contact this office.

Sincerely,

.x4k R. H. Engelken Director

Enclosure:

IE Bulletin No.79-01B Supplement Information 8008140 3)Q

SSIr1F 68-20 Atl0:

79-12-19-06-96 UtlITED STATES flUCLEAR REGULATORY COMMISS10tl 0FFICE OF INSPECTIO:1 AND EtiFORCEMEtiT WASHIflGTON, D.C.

20555 February 29, 1980 IE Bulletin flo.79-01B Supplement Information ENVIRONMErlTAL QUALIFICATI0tl 0F CLASS IE EQUIPMErlT Enclosed are the generic questions and answers which resulted from flRC Task Group / Licensee " workshop" meetings held recently in flRC Regional Offices regarding IE Bulletin No.79-01B. This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.

The further intent of this information is to assist the licensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.

It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.

Enclosure:

Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:

h h

ANO h

No. of pages: