ML19290E626
| ML19290E626 | |
| Person / Time | |
|---|---|
| Site: | Humboldt Bay |
| Issue date: | 02/29/1980 |
| From: | Engelken R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Crane P PACIFIC GAS & ELECTRIC CO. |
| References | |
| NUDOCS 8003140306 | |
| Download: ML19290E626 (7) | |
Text
h(,
pn nec o
! j )".,( %'h UNITED STATES NUCLEAR REGULATORY COMMISSION 3('
REGION V
/. [E 0, f 5 1990 N. CALIFORNIA BOULEVARD h, *' \\
,e SUITE 202, WALNUT CRE E K PLAZA WALNUT CREE K, CALIFORNI A 94596 February 29, 1980 Docket No. 50-133 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention: Mr. Philip A. Crane, Jr.
Assistant General Counsel Gentlemen:
Enclosed is Supplement Information to IE Bulletin No. 79-018. This information is presented in the form of generic questions and answers which will assist you in responding to the actions required of IE Bulletin No.79-01B with regard to your power reactor facility (ies) with an operating license.
Should you have questions regarding this Supplement Information, please contact this office.
Sincerely, V~pS R. H. Engelken Director
Enclosure:
IE Bulletin No. 79-OlB Supplement Information 80087 ao 3
SSIfif 68-20 Afl0:
79-12-19-06-96 UtlITED STATES HUCLEAR REGULATORY COMMISSION OFFICE OF IfiSPECTION AfiD ENFORCEMEtiT WASHINGT0fi, D.C.
20555 February 29, 1980 IE Bulletin tio.79-01B Su,plcment Information ENVIRONMENTAL QUALIFICATI0f1 0F CLASS IE EQUIPMENT Enclosed are the generic questions and answers which resulted from NRC Task Group / Licensee " workshop" meetings held recently in NRC Regional Offices regarding IE Bulletin No.79-01B.
This information is intended to further the understanding of the qualification review process and reporting requirements of the Bulletin.
The further intent of this information is to assist the 4;ensees in providing a method of approach acceptable to the assigned NRC Task Review Group in determining adequacy of the environmental qualification of Class IE Electrical Equipment installed at their respective facilities.
It should be recognized that the review of the licensee's responses may generate additional need for guidance of finalized resolution of the environmental qualification issue.
Enclosure:
Generic Questions and Answers to IE Bulletin No.79-01B DUPLICATE DOCUMENT Entire document previously entered into system under:
f b
ANO No. of pages:
b
.